City of Fairview Heights (IL)
Codes
- NEC Code Version
- 2020
- Code List
2021 INTERNATIONAL RESIDENTIAL CODE (IRC)
2021 INTERNATIONAL BUILDING CODE (IBC)
2021 INTERNATIONAL MECHANICAL CODE (IMC)
2021 INTERNATIONAL PLUMBING CODE (IPC)
2021 INTERNATIONAL FUEL GAS CODE (IFGC)
2021 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC)
2021 INTERNATIONAL SWIMMING POOL AND SPA CODE (ISPSC)
2020 NATIONAL ELECTRICAL CODE (NEC)
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- Rough Inspection
- Racking Inspection
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Snow Load
- 20
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Battery,MPUs,Battery - Partial Backup,Battery - Whole home backup
- Allowed POI
- Meter Adapter,Load Side Taps,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.65
- BOS Restrictions
Batteries must be mounted inside:
- If mounting in garage must install fire rated drywall behind it and above it (3β on either side and 3β out from the front face of the battery minimum)
- If mounted in the home and not in a living quarters must be mounted on a fireproof surface with fire rated drywall above it(3β on either side and 3β out from the front face of the battery minimum)
- Cannot be mounted in a living quarters. In order to do so we must build a fireproof surface rated room around it.
- All circumstances require heat detectors be hardwired to existing smoke detectors in the home.
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- AHJ does not allow ESS to be mounted outside. ESS must be mounted inside.
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Attachment Detail Notes
- Electrical Diagram
For Battery Projects where battery is located indoors:
- Electrical stamp required
- Note on ELD and site plan stating "PER 2023 NFPA 855 GUIDELINES"
- ESS disconnect must be grouped with other disconnects
Temp Correction factor needs to show: .94 from Inverter to Disconnect
.71 from JB to Inverter
For derating conductors change from 1 to .71 if running in the attic or .58 if on roof
Action requested: Update plans to include required Emergency Stop (Eβstop) details per AHJ expectations
- Label Page
The aerial view placard will need to be oriented from the disconnects point of view, upright, read left to right have the address and the compass bug.
- Label Page Notes
All Jobs [Values for labeling will be engraved placards, UV resistant, waterproof, red background with white lettering no smaller than 3/8]
- Custom Placards Required
- 1
- Placards Notes
AHJ requires 12x12 site map placard for any projects. Placards must be:
- Engraved
- UV resistant
- Waterproof
- Have a red background with white lettering no smaller than 3/8
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim