City of Effingham (IL)
NEC Code Version2023
Fire Code Version2015 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2015 Building Code
- Code List
2024 INTERNATIONAL BUILDING CODE
2015 INTERNATIONAL ENERGY CONSERVATION CODE
2024 INTERNATIONAL FIRE CODE
2015 INTERNATIONAL SOLAR ENERGY PROVISIONS AND ORDINANCE
2024 INTERNATIONAL RESIDENTIAL BUILDING CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2015 INTERNATIONAL SOLAR ENERGY PROVISIONS, AND ORDINANCE
2023 NFPA 70 NATIONAL ELECTRICAL CODE
NFPA 101 LIFE SAFETY CODE, 2015 EDITION
NFPA 101 LIFE SAFETY CODE, 2012 EDITION
ILLINOIS STATE PLUMBING CODE
ILLINOIS ACCESSIBILITY CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Ridge Setback
- 4
- Rake Setback
- 0
- Eave Setback
- 0
- Setback Notes
AHJ VERY STRICT ON SET BACKS FOLLOW INSTRUCTION BELOW
- From top of peak to top of array - 4ft min.
- From any form of chimney - 4ft min.
- From Hip - 4ft min.
- Lower eaves - 0ft
- Rakes - 3ft
Structural & loads
- Wind Speed
- 90
- Snow Load
- 20
- Reducible Snow Load Allowed
- 1
- Structural Notes
- The letter from the engineer needs to reference a site visit to identify the size and spacing of the existing roof’s framing structure and the approved module count.
- The letter must state whether the existing framing is permitted to remain unaltered or if structural modifications are required.
- Include the following information:
- Roof Style, Roof Type, Roof Height, Rafter Type, Rafter Size, Seam Spacing, Roof Slope, Wind speed, Risk category, Exposure, Ground snow load, & Seismic Load.
- Minimum Ground On Roof
- #10
Electrical
- Allowed POI
- Meter Adapter,Line Side Taps,Load Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Site
All Jobs:
- Electrical equipment must be at least 3' from gas meter.
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim