City of Des Plaines (IL)
Codes
- NEC Code Version
- 2014
- Fire Code Version
- 2015 Building Code
- Code List
2015 INTERNATIONAL BUILDING CODE
2015 INTERNATIONAL RESIDENTIAL CODE
2015 INTERNATIONAL FIRE CODE
2015 INTERNATIONAL MECHANICAL CODE
2015 INTERNATIONAL FUEL GAS CODE
2015 INTERNATIONAL PROPERTY MAINTENANCE CODE
2014 NATIONAL ELECTRICAL CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard 3' Fire Setbacks
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category B
- Snow Load
- 30
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
PE Requirements
- SE digital stamps on corresponding PV pages & PE Letter / Calcs.
- WS 115 MPH GSL 30 PSF
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
- Cover Page Notes
All Jobs [Require both building and electrical - will have to go inside for all inspections. // A qualified Electrician, approved plans, this plan review, attic access and a ladder are required to be available on site at time of inspections. // Inspector will verify hot-cold-gas at water heater. // Inspector will verify CWB from panel to main water service with jumper across meter. // Must have Dual Power Source sticker on MSP cover. // Inspector will verify tightness of clamps and bushings as well as check for duct seal at entry point of MSP.]
- Site Notes
All Jobs [Panels and modules shall not be located less than 3 feet below the roof ridge to allow for fire department smoke ventilation operations. (IRC R324.7.2.5)]
- Roof Plan
- Roof Plan Notes
All Jobs [Panels and modules shall not be located less than 3 feet below the roof ridge to allow for fire department smoke ventilation operations. (IRC R324.7.2.5)]
- Electrical Diagram
- Electrical Diagram Notes
All Jobs [#6 AWG TO TWO NEW GROUND RODS 5/8" X 8' SPACED 6' APART AND BONDED TO METAL WATER PIPE WITHIN 5' OF POINT OF ENTRANCE]
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim