City of Twin Falls (ID)
NEC Code Version2017
SolarAPP+ StatusTargeted
Wet Stamps RequiredNone
Fire Setback Enforced0
Codes
- NEC Code Version
- 2017
- Code List
2018 International Residential Code, Parts I-VI and IX, appendices A, B and G (with State amendments). 2018 International Energy Conservation Code (with Idaho State amendments) 2017 National Electrical Code (with State amendments) 2017 Idaho State Plumbing Code AS ADOPTED BY CITY OF TWIN FALLS
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- No
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category C
- Snow Load
- 15
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- If the roof load is >5 lbs/sqft installation instructions and engineering showing roof will support the load (building permits will be needed if changes to the roof are required)
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Line Side Taps,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim