City of Star (ID)
Spot something wrong?
These change with code cycles. If a requirement here is out of date or missing, tell us and we'll fix it.
Report a correction NEC Code Version2017
Fire Code Version2018 Building Code
Fire Setback EnforcedYes
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2017 NATIONAL ELECTRICAL CODE 2018 INTERNATIONAL BUILDING CODE 2018 INTERNATIONAL FIRE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- Yes
- Rough Inspection
- Rough Electrical
- New Planset Required For Module Swap
- Yes
Stamps
- Structural Calculations Required
- No
Fire setbacks
- Fire Setback Enforced
- Yes
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 120
- Wind Notes
Exposure Category C
- Snow Load
- 25
- Reducible Snow Load Allowed
- Yes
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Line Side Taps,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- No
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Custom Placards Required
- No
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim