City of Nampa (ID)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL RESIDENTIAL CODE
2018 INTERNATIONAL MECHANICAL CODE
2017 IDAHO STATE PLUMBING CODE
2018 INTERNATIONAL FUEL GAS CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2018 INTERNATIONAL EXISTING BUILDING CODE
2018 INTERNATIONAL SWIMMING POOL AND SPA CODE
2018 INTERNATIONAL FIRE CODE
2023 NATIONAL ELECTRICAL CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 1
- Revision Required
- 1
- New Planset Required For Module Swap
- 1
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 105
- Snow Load
- 999
- Snow Load Notes
Roof snow load: 25 Ground snow load: 20
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Structural calculations stamped by a licensed Idaho Structural Engineer, based on the 2018 International Existing Building Code, Article 1103.2, Additional Gravity Loads. Plans to be unlocked so AHJ may apply approval stamp
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Load Side Taps,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- Demonstrate 3' minimum between ESS where multiple ESS are being installed
- When the MSP is being repurposed as a sub panel and the Tesla Gateway is being used as service equipment, add the following note to the ELD: "A main bonding jumper will be installed in the Tesla Gateway. (The main bonding jumper comes pre-installed in the Gateway 2)"
- 1/31/24 WHEN USING A WHOLE HOME CONFIGURATION FOR BATTERIES, THERE SHOULD BE A 200A FUSED DISCO BETWEEN GATEWAY AND UM. THIS 200A DISCO SHOULD HAVE A NEUTRAL/GROUND BONDING TO BECOME THE MAIN SERVICE, ADD SPEC SHEET OF THIS DISCONNECT TO PLANS
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Include photos of the service equipment including supanels.
- Cover Page Notes
Table of contents must match actual order and description of pages
- Roof Plan
Dimensions from Array to roof ridges, valleys, and lateral edges of roof must be provided
- Electrical Diagram
-Centerfed 120%: No
-All Jobs Include pictures of the Service Panel and Meter. Service panel with deadfront removed. Meter photo needs to show the entire meter base. Subpanels to be included in photos
-MPU Clearly specify on the line diagram the exact model number of the service panel you are going to install and provide manufacturer specification sheets for such service panelboard.
-Line diagram must be drawn correctly based on the type of new service panel that will be installed. In other words, the layout of the service panel on the diagram must match that of the actual service panel.
- Label Page
Equipment Submittal showing all related listed Photo Voltaic Equipment used including all manufacturers information, specifications, and installation requirements for all equipment.
- Custom Placards Required
- 0
- Non Standard Revision Requirements
Red cloud only the newest changes. All prior red clouding must be removed.
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim