City of Boise (ID)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL FIRE CODE
2023 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 1
- Revision Required
- 1
- New Planset Required For Module Swap
- 1
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 105
- Wind Notes
Exposure Category C
- Snow Load
- 25
- Snow Load Notes
- Reducible Snow Load Allowed
- 0
- Max Attachment Spacing
- 96
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,Load Side Taps,PV Breaker,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Standard
- If applicable, make sure the updated 2025 Stamped Ecofasten letter is on the last page of the planset. example is uploaded to files section.
- Roof Plan
* Plans drawn to scale (¼ inch = 1 foot typical).
- Attachment Detail
## Spec Sheets: Manufacturer specifications (1 copy for paper submittal) for photovoltaic panels, inverters, racking, AC disconnect. Specifications need to show equipment as labeled in accordance with the appropriate UL listing (i.e. UL 1703 for pane, UL 1741 for inverters, etc.) ## ICC-ES Evaluation Services Report: ICC-ES Evaluation Services Report (1 copy for paper submittal). For all mounting brackets used to attach the panels to the roof structure ## Provide a Certificate of Appropriateness Provide a Certificate of Appropriateness (1 copy for paper submittal) from Planning for all installations in a Historic District.
- Electrical Diagram
## Electrical Diagram: One-line electrical diagram (1 copy for paper submittal) depicting location of equipment, voltage and current ratings, wire size, disconnect rating, overcurrent protection ratings. ## MPU: Provide spec sheets for the new electrical panel that will be installed, please make sure URL or other Osha recognized NRTL testing agency is listed on the spec sheet.
If SST/LST show subpanel (if LST) and show ampacity of wires where the tap is taking place.
- Custom Placards Required
- 0
- Non Standard Planset Requirements
- Single Line Diagram
- Non Standard Revision Requirements
Remove any previous red clouding before sending for stamps. Only the most recent changes to the plans should have clouding.
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim