County of Coweta (GA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2018 INTERNATIONAL BUILDING CODE WITH GEORGIA AMENDMENTS 2018 INTERNATIONAL RESIDENTIAL CODE WITH GEORGIA AMENDMENTS
2018 INTERNATIONAL FIRE CODE
2018 INTERNATIONAL PLUMBING CODE
2018 INTERNATIONAL MECHANICAL CODE
2018 INTERNATIONAL FUEL GAS CODE
2015 INTERNATIONAL ENERGY CONSERVATION CODE
2018 INTERNATIONAL SWIMMING POOL AND SPA CODE
2023 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 2
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
2018 IRC
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category B
- Snow Load
- 5
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- All Jobs
- Allowed POI
- Line Side Taps,Load Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Electrical load calcs required for ALL projects. (even for MPU)
- Cover Page Notes
-ALL PERMITTED PROJECTS SHALL COMPLY WITH THE COWETA CODE OF ORDINANCE, APPENDIX A - ZONING AND DEVELOPMENT, ARTICLE 6D. - SOLAR ENERGY SYSTEMS AND FACILITIES. ALL SOLAR ENERGY SYSTEMS AND/OR SOLAR ENERGY FACILITY COMPONENTS SHALL BE INSTALLED AND MAINTAINED PER THE MANUFACTURE’S SPECIFICATIONS. -THE SOLAR ENERGY SYSTEMS ARE CONSIDERED STRUCTURES OR APPURTENANCES AND SHALL COMPLY WITH THE UNDERLYING HEIGHT REQUIREMENTS IDENTIFIED IN ARTICLE 23. -THE SOLAR ENERGY SYSTEM SHALL NOT BE USED TO DISPLAY ADVERTISING. THE MANUFACTURES’ OR INSTALLERS’ IDENTIFICATION AND APPROPRIATE WARNING SIGNAGE SHALL BE POSTED AT THE SITE IN A CLEARLY VISIBLE MANNER. -THE SOLAR ENERGY SYSTEM AND/OR SOLAR ENERGY COMPONENTS SHALL BE DESIGNED WITH AN ANTIREFLECTIVE COATING OR AT LEAST NOT PRODUCE GLARE THAT UNDER NORMAL OPERATING CONDITIONS WOULD CONSTITUTE A NUISANCE TO OCCUPANTS OF NEIGHBORING PROPERTIES, AIRCRAFT, OR PERSONS TRAVELING ADJACENT OR NEARBY ROADS. -ANY SOLAR ENERGY SYSTEM INSTALLED TO BE USED BY SOMEONE OTHER THAN THE OWNER OF THE PROPERTY SHALL PROVIDE AN AFFIDAVIT OR EVIDENCE OF AGREEMENT BETWEEN THE LOT OWNER AND THE SYSTEM’S OWNER OR OPERATOR CONFIRMING THE SYSTEM’S OWNER HAS PERMISSION OF THE PROPERTY OWNER TO INSTALL AND UTILIZE THE SYSTEM. -CONSTRUCTION SHALL COMPLY WITH THE 2018 IRC WITH GEORGIA AMENDMENTS AND THE 2023 NEC. -MECHANICAL EQUIPMENT, INCLUDING BUT ARE NOT LIMITED TO, ON-SITE TRANSMISSION LINES, PUMPS, BATTERIES, INVERTERS, MOUNTING BRACKETS, FRAMING, FOUNDATIONS, OR OTHER STRUCTURES, SHALL NOT BE LOCATED ON A STREET-FACING SLOPE OF A PITCHED ROOF. -ONLY BUILDING INTEGRATED OR FLUSH MOUNTED SOLAR ENERGY SYSTEMS MAY BE MOUNTED ON -STREET-FACING BUILDING ELEVATIONS. THE SOLAR ENERGY SYSTEMS AND COMPONENTS ASSOCIATED WITH A BUILDING INTEGRATED OR FLUSH MOUNTED SOLAR ENERGY SYSTEM SHALL NOT BE MOUNTED OR AFFIXED TO ANY FREESTANDING WALL OR FENCE. -SOLAR PANELS INSTALLED ON THE SLOPED ROOF SHALL NOT VERTICALLY EXCEED THE HIGHEST POINT OF THE ROOF WHICH IT IS ATTACHED. -ALL COMPONENTS SHALL BE SIMILAR BUILDING COLOR AS THE MATERIAL TO WHICH THEY ARE AFFIXED. -NOTE ON THE PLANS WHERE THE PANELS ARE SHOWN.
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim