Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Village of Wellington (FL)

Florida Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
SolarAPP+ StatusNot accepted
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL

2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL

2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING

2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS

2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION

2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY

2023 8TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)

2020 NATIONAL ELECTRIC CODE (NEC)

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Not accepted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Ee Stamp Notes

Digitally Verified Signature

Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Provide a life-safety pathway plan and dimensions, with not fewer than two pathways, on separate roof planes from lowest roof edge to ridge and not less than 36 inches as per FBC 7th Section 324.6.1 & FFPC. 11.12.2.2.2.3.

Structural & loads

Wind Speed
162
Wind Notes

Exposure Category C

Snow Load
0
Snow Load Notes

0 PSF

Reducible Snow Load Allowed
1
Max Attachment Spacing
48
Structural Notes

PE and EE required stamps, Sealed on all pages- DCR Morin, Wilfred - AS 11/4 **PLANS MUST BE UPLOADED INDIVIDUALLY** **SE / EE digital stamps & valid verifiable signed on all PV pages 1-7a. Digitally stamped & valid verifiable signed FL Statute & SECalcs Letter.** **WS 162**


Digitally Verified Signature

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,PV Breaker,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
75
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Affadavit to be completed by designer (see attachment below) Complete the Solar Checklist Form in the files below and upload it with the PV plans

AHJ requires us to use attachments that have an NOA. Attach NOA to planset.

Custom Placards Required
1

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Village of Wellington (FL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.