Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Town of Cutler Bay (FL)

Florida Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredWet Structural,Wet Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL

2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL

2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING

2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS

2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION

2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY

2023 8TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)

2020 NATIONAL ELECTRIC CODE (NEC)

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
2
Revision Required
1
Rough Inspection
Rough Electrical
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Wet Structural,Wet Electrical
Structural Calculations Required
Yes
Ee Stamp Notes

EE wet stamps and FL Statute

Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

4'-6'' setbacks at ridge, gables and flat roof. Any orientation is allowed. Portrait preferred but not necessary

Structural & loads

Wind Speed
175
Wind Notes

PV modules, Racking, connection, and Stand-offs shall be rated for the wind pressure zones they are installed in. HIGH-VELOCITY HURRICANE ZONE (HVHZ) PV REQUIREMENTS Buildings and structures located within the high-velocity hurricane zone shall comply with the provisions of Sections 1605, 1607, 1611, 1616 through 1626. The High Velocity Hurricane Zone (HVHZ) consists of Miami-Dade and Broward Counties. Sections 1512 through 1525 set forth the minimum requirements for the installation of roofing components, roofing systems and roofing assemblies and the waterproofing there of.

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

SE wet stamps on all PV pages, PE Letter / Calcs Two SIF forms, signed and sealed by PE (in files section) After installation, a post-install letter will be required. An example has been uploaded to the files below named PIL Template"."


This AHJ does not accept stamped signature. Wet signature required

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates,MPUs
Allowed POI
Load Side Taps,Line Side Taps,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Roof Plan

M1 sealant for comp shingles roofs (attach NOA to plans) GAF flex sealant for tile roofs (attach NOA to plans) 4'-6'' setbacks at ridge, gables and flat roof. Portrait orientation only (Landscape is not allowed)

Attachment Detail

* Add 'M1 NOA' text to all roof mounted comp shingle projects. See files below * Add 'GAF NOA ' text to all roof mounted tile projects. See files below * Please provide wind pressure calculations for respective HVHZ roof zones * Provide safety factor for LAG BOLT

Electrical Diagram

**MPUs** * Provide the AIC rating of the new main service panel * Provide information that the new service panel complies with NEC 230.6 and 230.70.

Label Page

FLORIDA - 2020 CAD BLOCK

Ground mount

Ground Mount Fencing Required
Mesh/Scrim