County of Broward (FL)

Florida Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredWet Structural,Wet Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL

2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL

2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING

2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS

2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION

2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY

2023 8TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)

2020 NATIONAL ELECTRIC CODE (NEC)

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,MPU,MPU,Derate,Derate,Derate
How Many Plansets Required
2
Revision Required
0
Rough Inspection
Rough Electrical
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Wet Structural,Wet Electrical
Structural Calculations Required
Yes
Ee Stamp Notes

EE Stamp required. Load calcs require EE Stamp, if applicable.

Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
170
Wind Notes

Exposure Category C ; HVHZ

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

* All pages PE & EE stamped, not separated. Wet stamped and signed, 2 sets of stamped documents mailed to 3590 NW 54th St #3, Fort Lauderdale, FL 33309, USA * We enforce the FBC 2020, NEC 2017, (FFPC) -7th edition, specifically Chapter 11.12 & NFPA 70, ed. 2017 (Pay special attention to the Roof Access section 11.12.2.2 in NFPA 1, 7th edition) * Digital stamp is also needed for an online Environmental permit. * Stamped Special Inspector Form Required * PE calcs must provide site specific attachment strength detail and lag bolt pull out calculations.


This AHJ does not accept stamped signature. Wet signature required

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Load Side Taps,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

ATTACH AND FILL OUT SIF

Derate required load calcs signed by EE, Requirements for electronic signing and sealing of plans and documents are set forth by the regulations of the appropriate professional board of licensing. The ePermit system allows for documents to be signed and sealed by two methods. Electronic Sign and Sea The “electronic sign and seal method utilizes the esign process that is built into the ePermit system. This method is free, but requires a one page signature document to be printed and manually signed and sealed by the registered professional(s). The signature document(s) must be submitted in original form to conform with the professional licensing regulations. Digital Sign and Seal The digital sign and seal method requires purchasing a subscription from a third party digital signature provider, such as Globalsign and Verisign. When we receive a document that has been signed and sealed digitally, we can instantly confirm the documents validity which allows for immediate processing. The advantage of digital sign and seal is it eliminates the need for a paper document to be produced and distributed, allowing for 100% paperless and streamlined processing. Provide flashing documentation along with fire classification.

Roof Plan

* Provide visual Array Wind zones Exposure on the roof with Exposed, Non-Exposed, Edge, module clearance and nominal installation spans, cantilever dimensions and Fire setbacks. * Clearly show identifiable Panel Module stand/mounting Locations attachments

Attachment Detail

If not using rail attachment system, make sure all callouts of the word "rail" are removed from the page

Electrical Diagram

Taps

  • Piercing taps NOT ALLOWED
  • Utilize Polaris taps
Label Page

FLORIDA 2020 CAD BLOCK

Custom Placards Required
1
Placards Notes


Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Ground Mount Notes

1\. Do you require ground mounts to have additional fencing or meshing protecting the array? * We enforce the NEC 2017

Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the County of Broward (FL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.