City of Tallahassee (FL)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL
2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL
2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING
2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS
2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION
2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY
2023 8TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)
2020 NATIONAL ELECTRIC CODE (NEC)
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- Other (See Submission Notes)
- Revision Required
- 1
- Rough Inspection
- Rough Electrical
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
Digitally Verified Signature
Obtain a Digital signature thru a Certificate Authority OR complete the city provided form that allows for a digital notary to verify drawings signed by a licensed individual. http://www.talgov.com/Uploads/Public/Documents/growth/pdf/orig-doc-notary-affadavit.pdf
- Stamp Location On Plans
- Center
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 120
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
SE / EE digital stamps on corresponding PV pages & PE Letter / Calcs. FL statue Letter required the plans required to be separated, sealed, and stamped per page for submission. Provide 3rd party certificate authority on all sheets. Plans are not allowed to be self certified by the Engineer. Provide separate PDF sheets for separate reviews for Structural and Electrical reviewers. Digital separated stamped pages in a zip file
Digitally Verified Signature
Obtain a Digital signature thru a Certificate Authority OR complete the city provided form that allows for a digital notary to verify drawings signed by a licensed individual. http://www.talgov.com/Uploads/Public/Documents/growth/pdf/orig-doc-notary-affadavit.pdf
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
POWERWALL PROJECTS ATTACH THIS TO PLANS "Template - Attestation Letter - IX" (SEE FILES)
- Cover Page
- Site Notes
All Jobs [The visible Lockable labeled disconnect is within 10FT of the utility meter]
- Roof Plan
- Electrical Diagram
Provide max AC output current of equipment
Show two ground rods on electrical diagram.
- Electrical Diagram Notes
All Jobs [The visible Lockable labeled disconnect is within 10FT of the utility meter]
- Label Page
FLORIDA 2020 LABEL
- Custom Placards Required
- 1
- Placards Notes
REQUIRES CUSTOM PLACARD
6 X 6
WITH DETAILED LAYOUT OF THE ARRAYS
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim