City of Pensacola (FL)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL
2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL
2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING
2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS
2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION
2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY
2023 8TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)
2020 NATIONAL ELECTRIC CODE (NEC)
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- Other (See Submission Notes)
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
Digitally Verified Signature
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 151
- Wind Notes
Exposure Category C ; HVHZ
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
All PE deliverables need to be combined in 1 PDF. Any document being stamped or generated by the engineering firm needs to be included in one single PDF.
Stamp needed on all pages 1-7a, FL Statute & PE Letter / Calcs
Digitally Verified Signature
AHJ requires the documents security settings have the markups allowed. Please allow markups in the document security settings so they can apply approval stamps.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- ESS Elevation Detail Required
- No
Plan set
- Electrical Diagram
**TAPS** Line Side Taps required and additional disconnect. Disconnect should be labeled "Service Disconnect 1 of 2" for the new Fused Disconnect and "Service Disconnect 2 of 2" for the Main breaker or OCPD that protect the POI.
- Label Page
FLORIDA - 2020
- Custom Placards Required
- 1
- Non Standard Revision Requirements
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim