Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Miami Gardens (FL)

Florida Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL

2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL

2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING

2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS

2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION

2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY

2023 8TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)

2020 NATIONAL ELECTRIC CODE (NEC)

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
2
Revision Required
1
Rough Inspection
Rough Electrical
New Planset Required For Module Swap
1

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Ee Stamp Notes

Digitally Verified Signature

Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

One 4ft setback required to eave / ridge

Structural & loads

Wind Speed
175
Wind Notes

Exposure Category C ; HVHZ

Snow Load
0
Snow Load Notes

No Snow Load

Reducible Snow Load Allowed
1
Max Attachment Spacing
48
Structural Notes

Stamp Tech Instructions: SIF must be pre-filled prior to sending to PE to complete.

PE Instructions: SE / EE digital stamps on all corresponding PV pages 1-7a. Stamped FL Statute, PE Letter / Calcs & Special Inspector Form required.


Digitally Verified Signature

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,Line Side Taps,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91
BOS Restrictions

It is imperative that the Electrical Production Manager reviews ALL sold projects at that correspond to this AHJ when the project is in the SOW stage. (staff)

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

No Battery allowed in the garage.

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

APPROVED PLANSET UPLOADED FOR CORRECT REFERENCE


ANY project with an MPU needs to have a Fault Current Letter requested from the Utility at the CR Stage.


MPUs: Separate drawing including electrical riser diagram panel schedule, load calculation, FPL available fault current letter and calculation to substantiate main breaker KAIC must be submitted. Light dash lines or dark solid lines must be used to separate the scope of work on this drawing from the photovoltaic installation, or cloud service components to isolate from the photovoltaic system

ATTACH SIF (SEE FILES)

Cover Page

Canadian Solar CS3N-400MS is the current used module. MS 11/11/2024

Electrical Diagram

ANY project with an MPU needs to have a Fault Current Letter requested from the Utility at the CR Stage.


Centerfed 120%: No

Provide an electrical riser diagram including the disconnect. Riser shall include conduit size, metal or PVC as applicable, conductor size, insulation type, material (copper or aluminum) Note: For MPUs, Remove this page from the PV version of plans, this will be its own set for the separate MPU permit. Also remove the [E] or [N] callout from the panel on the diagram, ensure the note "Service Upgrade by separate electrical permit" is on ELD)

Electrical Diagram Notes

All Jobs [Any CAT5e cables will run through dedicated enclosures]

MPU [Service upgrade covered by separate electrical permit]

Label Page

FLORIDA - 2020 CAD BLOCK

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
Yes
Ground Mount Notes

Shade Structures not allowed


Fencing, Mesh/Scrim required

Engineer report establishing minimum soil conditions for FBC Ch. 18 Soils and Foundations. The Soil Class must comply with FBC Ch. 18 Soils and Foundations Flood Zone: we have two SFHA 6AE and 7AE

Ground Mount Requires Soil Sample
Soil Study
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Miami Gardens (FL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.