Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Lakeland (FL)

Florida Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
SolarAPP+ StatusTesting
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2023 FLORIDA BUILDING CODE 8TH EDITION: BUILDING

2023 FLORIDA BUILDING CODE 8TH EDITION: RESIDENTIAL 

2023 FLORIDA BUILDING CODE 8TH EDITION: MECHANICAL

2023 FLORIDA BUILDING CODE 8TH EDITION: PLUMBING

2023 FLORIDA BUILDING CODE 8TH EDITION: FUEL GAS

2023 FLORIDA BUILDING CODE 8TH EDITION: ENERGY CONSERVATION

2023 FLORIDA BUILDING CODE 8TH EDITION: EXISTING BUILDING

2023 FLORIDA BUILDING CODE 8TH EDITION: ACCESSIBILITY 

2023 FLORIDA FIRE PREVENTION CODE 8TH EDITION

2020 NATIONAL ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Testing
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
Revision Required
0
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Ee Stamp Notes

Digital stamps, stamped pages need to be separated.

Digitally Verified Signature

Stamp Location On Plans
Top Right
Date On Stamps
Date Plans are Stamped

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Setback must start at load bearing wall.

EX: 1ft eave, setback must be 4ft

Structural & loads

Wind Speed
145
Wind Notes

Exposure Category C ; HVHZ

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
48
Structural Notes


Entire planset including specs need to be separated in a zip file


Digitally Verified Signature

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,Line Side Taps,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

FOR SEEB: ALWAYS ADD THE BACKUP INTERFACE MANUFACTURER SPEC SHEETS

Separate ESS Disconnect Required
No
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Plans to be separated

Roof Plan


Roof Plan Notes

All Jobs [Layout subject to change. // Conduit will be higher than 7/8 inches above the roof.]

Electrical Diagram


Electrical Diagram Notes

LST [Existing service complies with NEC 312.8. Disconnects will be grouped per NEC 230.72]

All Jobs [Interconnection Method subject to change // Solar Modules are Nationally Recognized Test Lab (NRTL), see spec sheet for details]

Label Page

FLORDIA - 2020

Custom Placards Required
1
Placards Notes

Site Placard is Required of layout.

Ground mount

Ground Mount Fencing Required
Mesh/Scrim