City of Hallandale Beach (FL)

Florida Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL

2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL

2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING

2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS

2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION

2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY

2023 8TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)

2020 NATIONAL ELECTRIC CODE (NEC)

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
1
Revision Required
1
Rough Inspection
Footing inspection
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Ee Stamp Notes

Digitally Verified Signature

Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

fire access from eave to ridge required

Structural & loads

Wind Speed
170
Wind Notes

C, HVHZ

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
48
Structural Notes

SE / EE digital stamps & valid verifiable signed on all PV pages 1-7a. Digitally stamped & valid verifiable signed FL statute, SE calcs letter, & Special Inspector Form aka SIF.

Plans / Documents must be Digitally Signed & Sealed by Design Professional, Digital Seal must be provided with third party verification. Unable to verify the validation/certification of the digital signature/seal of the (document); the fact that it has a digital stamp on it has no bearing, the digital document should have an encryption within it (not seen), if it is not there the document is just a copy; please provide the original third party verified digitally signed and sealed version of the document


Digitally Verified Signature

Minimum Ground On Roof
#10

Electrical

Allowed POI
PV Breaker,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Please show an elevation view of the equipment on the wall and how high above the grade the bottom of the equipment will be mounted.

NOA for M1 sealant is required (attached file)

UPLOAD SIF TO LIGHTSPEED (SEE FILES)

Cover Page Notes

All Jobs [Flood Zone: AH 5.0 NAVD]

Electrical Diagram

Taps

  • Piercing taps NOT ALLOWED
  • Utilize Polaris taps. 
  • provide the manufacturer's spec sheet with UL listing
Electrical Diagram Notes

All Jobs [PV Breaker to be placed at opposite end of bus bar furthest away from the main breaker]

if an interior loadcenter exists, show on one-line, if none exists add note to doc's stating "NO INTERIOR LOADCENTER ON THIS PROJECT"

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Hallandale Beach (FL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.