City of Hallandale Beach (FL)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL
2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL
2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING
2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS
2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION
2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY
2023 8TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)
2020 NATIONAL ELECTRIC CODE (NEC)
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- Footing inspection
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
Digitally Verified Signature
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
fire access from eave to ridge required
Structural & loads
- Wind Speed
- 170
- Wind Notes
C, HVHZ
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Structural Notes
SE / EE digital stamps & valid verifiable signed on all PV pages 1-7a. Digitally stamped & valid verifiable signed FL statute, SE calcs letter, & Special Inspector Form aka SIF.
Plans / Documents must be Digitally Signed & Sealed by Design Professional, Digital Seal must be provided with third party verification. Unable to verify the validation/certification of the digital signature/seal of the (document); the fact that it has a digital stamp on it has no bearing, the digital document should have an encryption within it (not seen), if it is not there the document is just a copy; please provide the original third party verified digitally signed and sealed version of the document
Digitally Verified Signature
- Minimum Ground On Roof
- #10
Electrical
- Allowed POI
- PV Breaker,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Please show an elevation view of the equipment on the wall and how high above the grade the bottom of the equipment will be mounted.
NOA for M1 sealant is required (attached file)
UPLOAD SIF TO LIGHTSPEED (SEE FILES)
- Cover Page Notes
All Jobs [Flood Zone: AH 5.0 NAVD]
- Electrical Diagram
Taps
- Piercing taps NOT ALLOWED
- Utilize Polaris taps.
- provide the manufacturer's spec sheet with UL listing
- Electrical Diagram Notes
All Jobs [PV Breaker to be placed at opposite end of bus bar furthest away from the main breaker]
if an interior loadcenter exists, show on one-line, if none exists add note to doc's stating "NO INTERIOR LOADCENTER ON THIS PROJECT"
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim