City of Fort Lauderdale (FL)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL
2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL
2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING
2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS
2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION
2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY
2023 8TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)
2020 NATIONAL ELECTRIC CODE (NEC)
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 2
- Revision Required
- 1
- Rough Inspection
- Rough Electrical
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
Digitally Verified Signature
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 170
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Structural Notes
### SE & EE digital stamps on all PV pages, FL Statute, PE Letter & Calcs. ### Include Special Inspector Form WS 170 MPH Although the AHJ has transitioned to digital stamps, any permits that were originally submitted in person with wet stamps before the AHJ adopted the online submittal process will continue to need wet stamps and in person submissions. Please confirm the original type of stamp requested for each project and order wet or digital to match the original stamp type.
Digitally Verified Signature
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,Load Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
ELEVATION PAGE IS REQUIRED
Please provide on plans the elevation of bottom of all new electrical panels/BOS. Must meet minimum requirements of BFE + 1.4'. Minimum elevation = 7.4' NAVD. Panel: 0369J/ AE 6'
ATTACH SIF TO LIGHTSPEED (SEE FILES)
- Roof Plan
- Attachment Detail Notes
All Jobs [Each attachment gets 1 lag. 3.5โ long by 5/16 diameter with a minimum 2.5โ embedment // Each lag to penetrate roof framing with existing 2.5โ embedment]
- Electrical Diagram
Taps
- Piercing taps NOT ALLOWED
- UTILIZE Polaris taps.
- Label Page
FLORIDA - 2020 EMERGENCY CAD BLOCK
- Custom Placards Required
- 0
- Non Standard Revision Requirements
AHJ requires only the pages that were revised
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim