Town of Breckenridge (CO)
NEC Code Version2023
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced0
Codes
- NEC Code Version
- 2023
- Code List
THE INTERNATIONAL BUILDING CODE, 2018 EDITION
THE INTERNATIONAL RESIDENTIAL CODE, 2018 EDITION, INCLUDING APPENDIX F AND K
THE INTERNATIONAL PLUMBING CODE, 2018 EDITION INCLUDING APPENDIX;
THE INTERNATIONAL MECHANICAL CODE, 2018 EDITION, INCLUDING APPENDIX A;
THE INTERNATIONAL FUEL GAS CODE, 2018 EDITION, INCLUDING APPENDIX A AND B;
THE INTERNATIONAL ENERGY CONSERVATION CODE, 2018 EDITION;
THE INTERNATIONAL EXISTING BUILDING CODE, 2018 EDITION;
THE NATIONAL ELECTRICAL CODE, 2023 EDITION;
THE ICC ELECTRICAL CODE - ADMINISTRATIVE PROVISIONS, 2006 EDITION;
THE UNIFORM CODE FOR THE ABATEMENT OF DANGEROUS BUILDINGS, 1997 EDITION.
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 2
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 90
- Snow Load
- 999
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- Allowed POI
- Load Side Taps,Line Side Taps,Meter Adapter,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim