County of Park (CO)

Colorado Authority Having Jurisdiction Solar permitting requirements

Spot something wrong?

These change with code cycles. If a requirement here is out of date or missing, tell us and we'll fix it.

Report a correction
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural
Fire Setback EnforcedYes

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2023 NATIONAL ELECTRIC CODE

2018 INTERNATIONAL RESIDENTIAL CODE

2018 INTERNATIONAL BUILDING CODE

2018 INTERNATIONAL MECHANICAL CODE

2018 INTERNATIONAL FUEL GAS CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
Yes
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
1
Revision Required
Yes
New Planset Required For Module Swap
Yes

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
Yes
Setback Notes

Standard

Structural & loads

Wind Speed
999
Wind Notes

Exposure Category C; Wind & Ground snow load varies from different addresses in county. To find Wind Speed & Snow Load go to this website: https://ascehazardtool.org/, type in address, click on wind & snow Load Types & risk category II.

Snow Load
999
Snow Load Notes

* Wind & Ground snow load varies from different addresses in county. To find Wind Speed & Snow Load go to this website: https://ascehazardtool.org/, type in address, click on wind & snow Load Types & risk category II.

Reducible Snow Load Allowed
Yes
Max Attachment Spacing
96
Structural Notes


Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,Line Side Taps,PV Breaker,Meter Adapter
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
No
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Electrical Diagram

Electrical permit required by the state. Please refer to the State of Colorado (DORA) (CO) for electrical requirements.

Custom Placards Required
No

Ground mount

Ground Mount Fencing Required
Yes
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the County of Park (CO) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.