County of Moffat (CO)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL RESIDENTIAL CODE
2018 INTERNATIONAL PLUMBING CODE
2018 INTERNATIONAL MECHANICAL CODE
2018 INTERNATIONAL FUEL GAS CODE
2018 INTERNATIONAL EXISTING BUILDING CODE
2018 INTERNATIONAL FIRE CODE
2018 INTERNATIONAL SWIMMING POOL AND SPA CODE
2023 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 2
- Revision Required
- 0
- Rough Inspection
- Racking Inspection
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Snow Load
- 999
- Snow Load Notes
Moffat County has a ground snow load of 57, however we have a 40psf non-reducible roof snow load. There are portions of the west edge of the county that have up to a 100psf roof snow load at higher elevations. So we will need to know the location and approximate elevation of the site.
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
All plans must be stamped by a Colorado State licensed engineer.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Line Side Taps,PV Breaker,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Electrical Diagram
Electrical permit is required through the state. Please refer to the State of Colorado (DORA) (CO) for electrical requirements.
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Ground Mount Notes
Does the county allow for ground screws as a method of building the array, or do you require standard footings? **If the design engineer specs helical ground screws that meet the 115 mph** **Wind load and 57lb ground snow load, then they are allowed.**
- Setback Front Yard
- 30
- Setback Back Yard
- 10
- Setback Side Yard
- 10