County of Grand (CO)
NEC Code Version2023
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2015 INTERNATIONAL RESIDENTIAL CODE
2015 INTERNATIONAL BUILDING CODE
2015 INTERNATIONAL MECHANICAL CODE
2015 INTERNATIONAL PLUMBING CODE
2015 INTERNATIONAL FUEL GAS CODE
2015 INTERNATIONAL ENERGY CONSERVATION CODE
2015 INTERNATIONAL EXISTING BUILDING CODE
2023 NATIONAL ELECTRICAL CODE
2015 INTERNATIONAL FIRE CODE
1997 UNIFORM CODE FOR THE ABATEMENT OF DANGEROUS BUILDINGS
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- Footing inspection
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
* Set-backs per 2015 IBC
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category C
- Snow Load
- 95
- Snow Load Notes
Roof & ground snow load must be labeled as non-reducible.
- Reducible Snow Load Allowed
- 0
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Line Side Taps,PV Breaker,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
- Plot/Site Plan Building Plans (Architectural Sheets in the following order) Plans shall be to scale 1/4β=1β-0 minimum.
- Structural Plans (Structural sheets in the following order) βPlans shall be to scale 1/4β=1β-0 minimum.
- Design criteria should include wind load & exposure, roof and deck dead loads & live (snow loads), floor live loads and dead loads, and assumed soil bearing capacities complying with soils reports when required.
- Cover Page
- Cover Sheet- Project Name, Address, Designer, Design Criteria (See Structural Plans section below).
- Site
- Roof Plan
- Show fire setbacks per 2015 IBC
- Electrical Diagram
Electrical permit required through the state. Please refer to the State of Colorado (DORA) (CO) for electrical requirements.
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim