City of Loveland (CO)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL SWIMMING POOL, SPA AND HOT TUB CODE
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2021 INTERNATIONAL FUEL GAS CODE
2021 INTERNATIONAL PROPERTY MAINTENANCE CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2023 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 1
- Revision Required
- 1
- New Planset Required For Module Swap
- 1
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 130
- Wind Notes
Exposure Category C
- Snow Load
- 30
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Structural calcs required.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
You must submit the PVWatts output for each panel facing. PV Watts to be done at the CR stage and added into the AM Deliverables folder; inputs and outputs will need to be seen on report. This should be the annual estimated output on the Interconnection Agreement. Plans need PVWatts Report for system size justification. If the utility is Loveland Water and Power, an Equipment Elevation drawing of the BOS is required. Provide drawing of BOS wall including service entrance, meter equipment, PV AC disconnect, PV inverters/combiner boxes, and all other added equipment. Show horizontal and vertical clearances. See Eqpt Elevation Drawing in Files section of this page. Show distance between equipment and property lines Equipment Elevation drawing of the BOS is required. Plans need PVWatts Report for system size justification
- Site Notes
Show distance between equipment and property lines.
- Electrical Diagram
* The utility meter must be updated to a lever bypass, the service must be updated to an underground service with the laterals in conduit. * **Line side taps are not allowed in the City of Loveland** ## **Battery Projects** * AC disconnect required between the meter/main and the battery interface
- Custom Placards Required
- 0
- Non Standard Planset Requirements
- BOS Elevation
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim