Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Loveland (CO)

Colorado Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2021 INTERNATIONAL SWIMMING POOL, SPA AND HOT TUB CODE

2021 INTERNATIONAL BUILDING CODE

2021 INTERNATIONAL RESIDENTIAL CODE

2021 INTERNATIONAL MECHANICAL CODE

2021 INTERNATIONAL PLUMBING CODE

2021 INTERNATIONAL FUEL GAS CODE

2021 INTERNATIONAL PROPERTY MAINTENANCE CODE

2021 INTERNATIONAL EXISTING BUILDING CODE

2021 INTERNATIONAL ENERGY CONSERVATION CODE

2023 NATIONAL ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
1
Revision Required
1
New Planset Required For Module Swap
1

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
130
Wind Notes

Exposure Category C

Snow Load
30
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Structural calcs required.

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

You must submit the PVWatts output for each panel facing. PV Watts to be done at the CR stage and added into the AM Deliverables folder; inputs and outputs will need to be seen on report. This should be the annual estimated output on the Interconnection Agreement. Plans need PVWatts Report for system size justification. If the utility is Loveland Water and Power, an Equipment Elevation drawing of the BOS is required. Provide drawing of BOS wall including service entrance, meter equipment, PV AC disconnect, PV inverters/combiner boxes, and all other added equipment. Show horizontal and vertical clearances. See Eqpt Elevation Drawing in Files section of this page. Show distance between equipment and property lines Equipment Elevation drawing of the BOS is required. Plans need PVWatts Report for system size justification

Site Notes

Show distance between equipment and property lines.

Electrical Diagram

* The utility meter must be updated to a lever bypass, the service must be updated to an underground service with the laterals in conduit. * **Line side taps are not allowed in the City of Loveland** ## **Battery Projects** * AC disconnect required between the meter/main and the battery interface

Custom Placards Required
0
Non Standard Planset Requirements
BOS Elevation

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Loveland (CO) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.