City of Greeley (CO)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- Not Enforced
- Code List
2021 INTERNATIONAL BUILDING CODE 2021 INTERNATIONAL RESIDENTIAL CODE 2021 INTERNATIONAL MECHANICAL CODE 2021 INTERNATIONAL PLUMBING CODE 2023 NATIONAL ELECTRICAL CODE 2021 INTERNATIONAL FIRE CODE 2021 INTERNATIONAL FUEL GAS CODE 2021 INTERNATIONAL ENERGY CONSERVATION CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
AHJ has adopted fire set-back requirements, per IRC section 324 .
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category C
- Snow Load
- 30
- Snow Load Notes
30 lbs ground snow load
- Reducible Snow Load Allowed
- 0
- Max Attachment Spacing
- 96
- Structural Notes
**_Stamp Tech Instructions:_** Must request that all documents are stamped or re-stamped simultaneously. They all need to reflect the same date stamped even when project is going through a revision. **_PE Instructions:_** SE/EE digital stamps on corresponding PV pages & PE Letter / Calcs. WS: 115mph. Exposure C. SL: 30lbs FOR NEW STAMP REQUESTS AND RESTAMPS. *All stamped documents must carry the same stamp date, even on revision / re-stamps.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,PV Breaker,Meter Adapter,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
PV Equipment cannot be enclosed inside the building.
- Cover Page Notes
All Jobs [Wind Speed = 115 mph; Snow load = 30 psf]
- Electrical Diagram
Electrical Engineer stamp required for every project on the electrical diagram.
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
Need to email the AHJ the property address and have them confirm whether a GM is allowed or not. Each property is zoned differently only R-M (residential Medium Density homes are permitted for Ground mounts.
If you he can advise if it is allowed or not and the setbacks for that particular lot.
- Setback Back Yard
- 5
- Setback Side Yard
- 5