City of Englewood (CO)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL FIRE CODE
2021 INTERNATIONAL FUEL GAS CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2021 INTERNATIONAL PROPERTY MAINTENANCE CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2023 NATIONAL ELECTRIC CODE ICC A117.1-17-2017 Standards for Accessible and Usable Buildings and Facilities
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 1
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
Digitally Verified Signature
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 135
- Wind Notes
Exposure Category B
- Snow Load
- 30
- Snow Load Notes
* Roof Snow Load - 30 psf * Ground Snow Load - 30 psf
- Reducible Snow Load Allowed
- 0
- Max Attachment Spacing
- 96
- Structural Notes
PE Requirements; SE & EE digital stamps on all corresponding PV pages & PE Letter / Calcs. Both Stamps must be signed and sealed. WS: 90mph / GSL: 30lbs All structural & electrical engineer stamps on plans, letter & calcs must be sealed electronically by all Engineers.
Digitally Verified Signature
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,Meter Adapter,PV Breaker,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Electrical Diagram
1-line diagram required
- Custom Placards Required
- 0
- Non Standard Planset Requirements
- Single Line Diagram
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Ground Mount Notes
Contact Community Development