NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusTesting
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback EnforcedYes

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2021 INTERNATIONAL BUILDING CODE

2021 INTERNATIONAL ENERGY CONSERVATION CODE

2021 INTERNATIONAL EXISTING BUILDING CODE

2021 INTERNATIONAL FIRE CODE

2021 INTERNATIONAL FUEL GAS CODE

2021 INTERNATIONAL MECHANICAL CODE

2021 INTERNATIONAL PLUMBING CODE

2021 INTERNATIONAL RESIDENTIAL BUILDING CODE

2023 NATIONAL ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Testing
Any SolarAPP+ Restrictions
Yes
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
1
Revision Required
Yes
Rough Inspection
Rough Electrical
New Planset Required For Module Swap
Yes

Stamps

Ee Stamp Required On SLD
Yes - 10kW+
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Ee Stamp Notes

Over 10kW requires EE Stamp

Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
Yes
Setback Notes

Standard

Structural & loads

Wind Speed
115
Wind Notes

Exposure Category B

Snow Load
35
Reducible Snow Load Allowed
Yes
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Meter Adapter,Load Side Taps,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
No
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Roof Plan

* Please illustrate the fire department access path on roof plan sheet. (IFC 605.11.3)

Electrical Diagram

Centerfed 120%: Not Sure Conductors from OCPD to inverter are required to be a minimum # 6 wire size per 705.11(B).


A minimum # 6 AWG required between electrical meter terminals, reducing lugs are not accepted.

Label Page

Include label with emergency contact information and company details per NEC 705.10

Custom Placards Required
No

Ground mount

Ground Mount Fencing Required
Situational
Ground Mount Notes

Frost Depth 30” below grade