Town of Yucca Valley (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- How Many Plansets Required
- 3
- Revision Required
- 1
- Rough Inspection
- Footing inspection
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes - 10kW+
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Ee Stamp Notes
EE stamps required for projects over 10kW
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category C
- Snow Load
- 5
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
ESS disconnect required within 6ft of ESS on same wall and not blocked by walls/gates/etc
- Separate ESS Disconnect Required
- Local Disconnect,ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
Complete checklist below for expedited permitting
Any plans that include trenching require an Arborist letter regardless of if there are any staff on the property or not.
- Electrical Diagram
For systems over 10kw. electrical engineers stamp is REQUIRED on SLD. Centerfed 120% allowed with re-configuration of loads
- Custom Placards Required
- 1
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
Any plans that include a ground mount or trenching require an Arborist letter regardless of if there are any staff on the property or not.
you can search to see if properties have a “patent easement” (typically on lots marked “GL” on assessor maps) here: (a past project L. DCR - AG)