County of Santa Barbara (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Date SolarAPP+ Accepted
- 45188
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- How Many Plansets Required
- 3
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Load Side Taps,Meter Adapter,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
WHEN MOUNTING BATTERY(S) IN INTERIOR OF GARAGE - Provide floor plan including all (E) doors and (E) lighting. Provide note: Smoke detector to be installed above all interferon mounted ESS equipment. ELD: Please show where WEG Soft Start is to be installed (attach spec sheets).
Include this note, Producer's storage device(s) will not cause the Host Load to exceed its normal peak demand. Normal peak demand is defined as the highest amount of power required from the Distribution System by Producer's complete facilities without the influence or use of the energy storage device(s).
ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
For Batteries & Any time we are installing a subpanel / relocating loads in general: Please note All relocated loads to comply with CEC210.12D. AFCI protection Please note that 25A back feed breaker on new sub panel to have additional hold down hardware CEC408.36D Ground Mounts - See attached guidelines in Files.
- Electrical Diagram
AHJ accepts 120% on center-fed mains with alternate means and methods. No EE stamp required.
- Custom Placards Required
- 1
- Placards Notes
Permanent placards from placard page of plans
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Ground Mount Notes
VEGETATION AROUND ARRAY SHALL BE CLEARED VERTICAL: 13'-6" HORIZONTAL: 10' may need scrim fencing under GMs to protect conductors (sending a past project to test)