County of San Joaquin (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- How Many Plansets Required
- 2
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Snow Load Notes
N/A
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,PV Breaker,Load Side Taps,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 1
- ESS Notes
No ESS disco [a past project] When the ESS is located more than 5 feet from the connected equipment or passes through a wall there shall be a disconnecting means provided at the ESS, and a manual pull handle disconnect located outside. [Araujo, Josue. DCR 052319] Stand-alone systems (battery backup) shall have a permanent plaque on the exterior of the building or structure at a readily visible location. The plaque shall indicate the location of the system disconnecting means, and that the structure contains a stand-alone electrical power system. [Martinez, Grace & Timothy - 5662 Prospectors Parkway. DCR 121620] As of 2/7/19, MID added new standards for SLD and placards for ESS devices. [a past project. DCR 022219]
- Separate ESS Disconnect Required
- Local Disconnect,ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
ALL JOBS: All structures on property to be labeled Do not round system size on plans EXISTING SYSTEMS: Provide module type and quantity as well as inverter type and quantity
EV CHARGER: Any project that includes an EV Charger will be required to have a separate set of plans showing EV Charger only EXAMPLE
- Electrical Diagram
MPUs require spec sheets and model number to be listed on plans
- Custom Placards Required
- 1
- Placards Notes
Battery projects (MID) extra placards required - see Azah, Beryl
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
AHJ Environmental Health Dept. is requesting -the plans get revised to show the accurate location for the wells and the septic -location of existing septic -location of the 100% septic replacement area attached onsite water waste form and septic document
environmental health records search: EnvironmentalHealth - Laserfiche WebLink
- Setback Front Yard
- 30
- Setback Back Yard
- 10