County of Sacramento (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Date SolarAPP+ Accepted
44802
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching
How Many Plansets Required
2
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
None
Structural Calculations Required
No
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category C

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

No PE required

Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
Yes
Electrical Load Calcs Required
Derates,Center Fed Panels
Allowed POI
Load Side Taps,PV Breaker,Meter Adapter,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes
  • WE SHOULD AVOID BATTERIES IN GARAGE AT ALL POSSIBLE. THIS SHOULD BE LAST RESORT AND ONLY IF THE PROJECT WILL BE DQED BY HOMEOWNER.
  • ESS shall be separated from each other by at least 3 feet of spacing unless smaller separation distances are documented to be adequate based on large-scale fire testing complying with Section 1207.1.5
  • ESS must be installed exterior to the home/garage (Resideo heat detectors are NOT approved)
  • When interior install is unavoidable, add the PROSIXSMOKEVA document/cutsheet to plans, and add this note to plans: "Resideo PROSIXSMOKEVA installed in each level of the home, sleeping room, and outside each sleeping room. Resideo PROA7 or PROA7PLUS to interconnect all devices together. All devices must be shown as interconnected for ESS notification. Add the PROSIXSMOKEVA document/cutsheet to plans."
  • Specs showing the ESS is UL 9540 compliance are required.
  • Ensure that the Inverter is noted "INVERTER/ESS" on Site Plan when it is a Tesla Powerwall 3
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Single Line Drawing: No loads (i.e. the battery) are allowed between the generation equipment and the production meter.


This AHJ submits all projects to the Fire Department, so on SolarApp - EZ Plansets we will still need to include all equipment locations on the Site Plan and Site Placard.

Cover Page

SOLARAPP: This AHJ submits all projects to the Fire Department, so on SolarApp - EZ Plansets we will still need to include all equipment locations on the Site Plan and Site Placard.

BATTERY Notes: If there is more than one TPW3 please add note to the site plan, "Tesla Powerwall 3 ESS batteries shall be spaced min. 4” apart per approved large-scale fire testing documentation."

Site

BATTERY JOBS

  • Illustrate distance of ESS system to all exterior openings.

BATTERY Notes: If there is more than one TPW3 please add note to the site plan, "Individual ESS units shall be separated from each other by at least 3 ft. unless large scale fire testing documentation is provided for reduced spacing."

Site Notes

Battery [ESS installed outdoors or on the exterior side of exterior walls shall be located not less than 3' from doors or windows directly entering the dwelling unit. // Individual ESS units shall be separated from each other by at least 3 ft. unless large scale fire testing documentation is provided for reduced spacing.]

Roof Plan Notes

Battery [ESS installed outdoors or on the exterior side of exterior walls shall be located not less than 3' from doors & windows directly entering the dwelling unit.]

Electrical Diagram

Centerfed 120%: EE Stamp Required - Stamped load calcs The PV meter and AC disconnect shall be placed next to the main service panel when in front of the gate for 24/7 access whenever possible.


Bus Certs not accepted in this AHJ


When using PCS we need to identify the location of PCS controller with a leader on the Enphase combiner panel on the ELD

Electrical Diagram Notes

Ground Mount [GROUNDING ELECTRODE REQUIRED AT ARRAY PER CEC 690.47 AND ARTICLE 250]

Custom Placards Required
1
Placards Notes

Verify proper and permanent labeling with the following information:

  • “PHOTOVOLTAIC DC DISCONNECT” and “WARNING ELECTRIC SHOCK HAZARD - DO NOT TOUCH TERMINALS - TERMINALS ON BOTH THE LINE AND LOAD SIDE MAY BE ENERGIZED IN THE OPEN POSITION”. 2013 CEC, Article 690.17.
  • For ungrounded systems, “WARNING - ELECTRIC SHOCK HAZARD. THE DC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE UNGROUNDED AND MAY BE ENERGIZED”. 2013 CEC 690.35(F).
  •  The DC disconnect shall also be properly and permanently labeled with the following Installed System Information: (1) Rated Maximum Power-Point Current (2) Rated Maximum Power-Point Voltage (3) Maximum System Voltage & (4) Short Circuit Current. 2013 CEC, Article 690.53
  •  The AC Disconnect shall be permanently identified with (1) Maximum AC Output, and (2) Operating AC Voltage. 2013 CEC, Article 690.54
  • If DC Disconnect, Inverter, and/or AC Disconnect are not in the same location as the Utility Service Panel is located, a permanent Plaque shall be installed on the Utility Panel identifying the location(s) of the other equipment. 2013 CEC, Article 690.56

Ground mount

Ground Mount Fencing Required
No
Ground Mount Notes
  • Leave a 5' public utility easement (PUE) setback on property lines that border adjacent properties (not required on property lines that border a street).
  • Leave 12.5 side street setback
  • Property line dimensions on the site plan should match the plot map
  • Add these notes to the site plan: 1) EXTRA CONCRETE WILL BE DISPOSED OF, OFF-SITE BY THE CONCRETE COMPANY 2) LANDSCAPING WILL BE RESTORED AFTER INSTALLATION
  • 10ft brush free clearance around array
  • A noncombustible base or a maintained vegetative surface shall be installed and maintained under photovoltaic arrays and associated electrical equipment installations.  
  • For record requests: https://saccounty.nextrequest.com/
Setback Front Yard
20
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the County of Sacramento (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.