City of Yucaipa (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Date SolarAPP+ Accepted
- 45884
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Storage Systems,Existing Systems,Trenching,MPU
- How Many Plansets Required
- 2
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category C
- Snow Load
- 999
- Snow Load Notes
**0 PSF Up to Elevation 1800 5 PSF Up to Elevation 2800**
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Load Side Taps,PV Breaker,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
SHOW LOCATION OF THE INTEGRATED SMOKE/HEAT DETECTOR AT THE ESS LOCATION. CLEARLY SHOW THAT THE BATTERIES ARE IN THE PROTECTED ZONE OR SHOW BOLLARDS.
- Separate ESS Disconnect Required
- ESS Disconnect,Local Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
STANDARD
- Site
AC Disconnect shall be readily accessible to MSP, cannot be located behind a gate.
- Electrical Diagram
STANDARD
Ground mount
- Ground Mount Fencing Required
- Situational
- Ground Mount Notes
GM: If the array is not accessible (property line fencing) then we just want the conductors Protected from physical damage. _See email from Inspector in attachments._
comments in plans and calcs.
1. Put wind and earthquake design data on the plans per CBC Sections 1603.1.4 & 1603.1.5.
2. Provide material specs. on the plans for concrete, reinforcement, steel and steel fasteners.
3. Provide RISA calculations output. Include the pages for "Global" and "Code Check".
4. Without a soils report use Soil Class 5 for lateral bearing capacity = 100pcf, bearing capacity = 1,S00psf, friction = 1500/6 = 250psf.
5. Note roof framing material and specs.
6. Provide shear transfer details from solar panel roof to post footing supports.