City of Yorba Linda (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching,MPU,Derate
- How Many Plansets Required
- 2
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes - 10kW+
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
Provide stamp on SLD for any projects over 10KW
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Snow Load Notes
N/A
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
STRUCTURAL OBSERVATION LETTER REQUIRED
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
If installed in garage, bollards are required
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
SHOW DIMENSION BETWEEN ROOF SURFACE AND SOLAR MODULE
LOAD CALCS REQUIRED FOR CENTER FED PANELS
- Cover Page
Note required on cover sheet
Dwelling equipped with fire sprinklers: Y / N
Number of stories:
Construction type: V-B
Occupancy: R-3 (residential) or U (misc, such as detached structures)
- Cover Page Notes
All Jobs [The contractor shall provide a written letter to the building inspector stating that all accessible structural connections have been installed in conformance with the requirements of the approved plans]
- Site
CALL OUT LOCATION OF GAS METER
- Roof Plan
SHOW CONDUIT RUN
LABEL ROOF SURFACES, MATCH WITH STRUCTURAL CHART
- Electrical Diagram
CENTER FED
LOAD CALCS REQUIRED FOR CENTER FED PANELS
MPU
PROVIDE DATASHEET FOR PANEL, SHOWING UL LISTING
TYPE 1 OR 2 SURGE PROTECTIVE DEVICE REQUIRED
- Custom Placards Required
- 1
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim