Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Woodland (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching
How Many Plansets Required
3
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Per Jose in Fire, they are OK with fire setbacks that comply with the 2017 Mid-Cycle Code Change for the CRC. 10/17/18 JM

Structural & loads

Wind Speed
85
Wind Notes

Exposure Category C

Snow Load
0
Snow Load Notes

N/A

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
Yes
Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
1
ESS Notes

ELEVATION VIEW:

  1. ALL 4 sides of battery must be dimensioned to meet manufacturer spacing requirements, they will not approve the design without this!
  2. If under covered porch provide dimensions and construction type (i.e. Type V or Wood)
  3. NEEDED NOTES:
  • Access and working space shall be provided and maintained about all electrical equipment to permit ready and safe operation and maintenance of such equipment in accordance with the California Electrical Code and the manufacturer's instructions.
  • ESS shall be separated from each other and doors/windows by minimum 3 feet. 
  • For interior installations, the garage walls/ceiling shall be protected with minimum 5/8" Type X gypsum board. The door leading into the living space shall be solid wood core and self-closing.

PW3: Battery and Inverter must be indicated separately in plans and legend



ELD NOTE:

Producer's storage device(s) will not cause the Host Load to exceed its normal peak demand. Normal peak demand is defined as the highest amount of power required from the Distribution System by Producer's complete facilities without the influence or use of the energy storage device(s).


Required Notes:


COVER PAGE:

  • Installation shall comply with NFPA 855, 2023 Edition
  • System shall be UL 9540 Listed.
  • Inverters shall be listed and labeled in accordance with UL 1741 or provided as part of the UL 9549 listing.
  • ESS Listed and labeled solely for utility or commercial use shall not be used.
  • A copy of the operations and maintenance manual shall be placed in an approved location to be accessible to AHJs and emergency responders.
  • Installing contractor shall verify the system is installed according to approved plans and the manufacturer’s instructions and operating properly.
  • Installing contractor shall provide training on the proper operation and maintenance of the system.
  • Systems connected to the utility grid shall use inverters Listed for utility interaction.
  • Residence shall be provided with interconnected smoke alarms.
  • Panels and modules shall not be located below an emergency escape and rescue opening. A minimum 36-inch-wide pathway shall be provided for all such openings.
  • No portion or component of the system shall be hidden from view by permanent placement of parts of the system or construction without notification, inspection, and approval by the Woodland Fire Department.


LABELS:

  1. ADD the installer CONTACT LABEL FROM FLORIDA LABELS
  2. NEEDED NOTES:
  • Signs and labels shall meet the requirements of NEC article 110.21(b), unless specific instructions are required by section 690, or if requested by the local AHJ.
  • Labels shall be permanently affixed to the equipment or wiring method and shall not be hand written.
  • Labels shall be of sufficient durability to withstand the environment where they are installed.
  • Labeling must be present on DC conduit, raceways, enclosures, cable assemblies, and junction boxes. Every 10 feet, at every turn, above/below penetrations, and all DC combiner and junction boxes.
  • Warning Labels Located Outside and/or Exposed to Sunlight Shall be Engraved or Etched Plastic Placards with Red Background and White Lettering o Manual: An operations and maintenance manual shall be provided to both the ESS owner or their authorized agent and system operator before the system is put into operation.
  • Installing contractor shall provide a label on the system containing contact information for qualified maintenance and service providers.
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements
  • Model CFH10 Heat Sensor is the approved heat sensor for this AHJ
Cover Page


Note on plan set if the residence has a fire sprinkler system installed or not.

must include:

construction type:

occupancy type:

sprinklers: (Y/N)

Batteries:

Electrical Diagram

If it is proposed to replace the existing Main-OCPD with a one with a lower amp trip-rating, then a residential load calculation shall be provided.

Custom Placards Required
1

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Woodland (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.