City of Visalia (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Date SolarAPP+ Accepted
45194
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching
How Many Plansets Required
Other (See Submission Notes)
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
None
Structural Calculations Required
No
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes
Structural needed if we are installing on patio cover
Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
Yes
Electrical Load Calcs Required
Derates,Load Relocation
Allowed POI
Meter Adapter,PV Breaker,Load Side Taps,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91
BOS Restrictions

Standard

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes
  • Single POI in main panel.
  • PV system must have dedicated breaker in gateway.
  • Battery isolating disconnect required.
  • A disconnecting means shall be provided for all ungrounded conductors derived from an ESS and shall be permitted to be integral to listed ESS equipment.
  • ESS - Must maintain 3' spacing between batteries.

The disconnecting means shall comply with all of the following:

  • The disconnecting means shall be readily accessible.
  • The disconnecting means shall be located within sight of the ESS. Where it is impractical to install the disconnecting means within sight of the ESS, the disconnect shall be installed as close as practicable, and the location of the disconnecting means shall be field marked on or immediately adjacent to the ESS. The marking shall be of sufficient durability to withstand the environment involved and shall not be handwritten.
  • The disconnecting means shall be lockable open in accordance with 110.25.
  • For one-family and two-family dwellings, a disconnecting means or its remote control shall be located at a readily accessible location outside the building.
  • If using lug feed to gateway provide photo of label showing lug kit # or spec sheet for MPU.
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Site

Provide 3' clearance around HVAC for maintenance.

Site Notes

Battery [Battery mounted outdoors or on the exterior side of exterior walls located not less than 3 feet (914 mm) from doors and windows directly entering the dwelling unit.]

Electrical Diagram
  • Show the size of OCPDs in sub-panel(s) and MSP.
  • Show that the sum of the ampere rating of all OCPDs on panels, both load and supply, excluding the rating of the main breaker protecting the MSP busbar does not exceed the ampacity of the busbar. CEC 705.12(B)((2)(c).
  • If combining systems, only one PV breaker allowed.
  • Bus certification REQUIRED if there is no panel sticker.

Per the AHJ building official they enforce the following types of tie ins:

  • Sum of all breakers
  • 120% rule (Breaker tie into the main)
  • Line side tap IF the panel is listed. Otherwise, we do a GMA with SCE's approval of max 60a's.
  • Two or more power sources must be on one single breaker at MSP. Per CEC 705.12(A) Each source interconnection of one or more power sources installed in one system shall be made at a dedicated circuit breaker or fusible disconnecting means.
  • Per AHJ if MSP label is missing, provide a letter from a California Electrical Engineer indicating the maximum breaker that can be installed in the branch circuit. (BUS CERTS)
Electrical Diagram Notes

PV Breaker [PV breaker shall be installed at the opposite end or as far as possible from the main breaker]

Label Page
  • To the distribution equipment, attach a permanent label with this wording: WARNING: THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE SHALL NOT EXCEED AMPACITY OF BUSBAR.
  • If you're doing a DERATE provide a placard stating Main Breaker Has Been Derated: Do Not Upgrade Breaker.
Custom Placards Required
1
Placards Notes
  • Permanent placards from placard sheet of plans
  • SPECIAL PLACARD - AHJ REQUIRES PCS SETTING FOR ALL TESLA POWERWALL JOBS

Special Solar Edge ESS Placard for SE ESS

  • LIST BATTERY TYPE & SPECS
Non Standard Revision Requirements

When revising plans, every change must be red clouded on all affected pages and the resubmission letter needs to list all updated pages in the plans.

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Setback Back Yard
5
Setback Side Yard
5
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Visalia (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.