City of Union City (CA)
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredNone
Fire Setback Enforced1
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Date SolarAPP+ Accepted
- 45145
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Storage Systems,Existing Systems,Trenching,MPU,Derate
- How Many Plansets Required
- 3
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 85
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- All Jobs,Derates,MPUs,Battery,Load Relocation,Taps
- Allowed POI
- Load Side Taps,PV Breaker,Line Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Battery [ESS to be installed per manufacturer's instructions. // PV/ESS system to comply with CEC 710.15, 706.16(F), CEC 710.15(G) for stand-alone or isolated microgrid supply.]
- ESS disconnecting means shall be permanently marked “ENERGY STORAGE SYSTEM DISCONNECT”. CEC 706.15(C)
- Elevation view of PV and ESS system components should detail the distances to doors and windows, height above ground, and clearance between adjacent equipment for the PV and ESS system components.
ESS IN INTERIOR LOCATIONS:
- Rooms and areas within dwelling units and attached garages with ESS shall be protected with smoke alarms. A heat detector, listed and interconnected to the smoke alarms shall be installed in locations within dwelling units and attached garages where smoke alarms cannot be installed due to their listing.
- Please detail impact protection at the garage if the ESS is in the driving path. Batteries in a location subject to vehicle damage shall be provided impact protection for spaces in the normal path of vehicle travel within the garage or otherwise subject to vehicular impact.
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
All Projects:
- OCCUPANCY CLASSIFICATION: R-3/U
- CONSTRUCTION TYPE: V-B
- NUMBER OF STORIES: 1
- FIRE SPRINKLERS: NO
- WUI / WILDLIFE URBAN INTERFACE: NO
- Please provide a racking installation manual showing testing with the Modules, Alternatively, run ground wires from the frames to the building ground rods (to provide direct positive grounding, instead of reference grounding). Please note on plans.
- Provide an 8"x11" legible photo of the electrical panel showing the entire enclosure (include sub panel when used to back feed) with the dead front removed with the main breaker visible. Ensure the Manufacturer's Nameplate Rating is also visible with the Panel's Max Amperage reflected
- Roof Plan
- Roof Plan Notes
All Jobs [Conduit to be painted to match the background]
- Electrical Diagram
- 120% allowed per code Please provide grounding information at main service meter
- Show the wire distances between each piece of equipment.
- Electrical Diagram Notes
- Custom Placards Required
- 1
- Non Standard Planset Requirements
- BOS Elevation
Ground mount
- Ground Mount Fencing Required
- Yes