City of Ukiah (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- How Many Plansets Required
- 4
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- None
- Structural Calculations Required
- No
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- If Utility is City of Ukiah, SE is required. ****_Update 7/21/21: staff, head building inspector, says they _allow breaker tie in_ as of July 2021_****
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,Meter Adapter,Load Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Add note on Site Plan: The Lockable fused disconnect must be within 10' of the Service Entrance Panel and must be accessible to the City at all times 24 HOUR UNRESTRICTED ACCESS See Placard requirements attachment for additional placard requirements SLD: NOTE: OPTION AVAILABLE FOR BOTH OH & UG SEALABLE GUTTER 8 X8 X16 MINIMUM POLARIS CONNECTORS TO BE USED FOR GUTTER BOX CONNECTIONS Wind Exposure: B or C Snow Load: No snow load unless above 1,300 foot elevation
- Electrical Diagram
City of Ukiah does NOT allow the line side tap to be in the customer panel. Only allow the solar to feed directly onto the grid BREAKER TIE IN ALLOWED
- Label Page
**City of Ukiah Utility jobs:**
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim