City of Tustin (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Date SolarAPP+ Accepted
45182
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching,Historic District
How Many Plansets Required
1
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Ee Stamp Notes
SCE Utility requires EE stamp on plans for line side tap POI.
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

SE digital stamps on all PV pages & PE Letter / Calcs. 1. Provide calculation by a licensed civil/structural engineer or architect to verify supporting members are adequate for existing and proposed loads. Alternate: Calculation is not required if arrays are supported at a maximum spacing of 4ft each direction and the maximum cantilever distance of panels is 18". 2. Provide lateral calculations by a licensed professional engineer or architect showing that affected existing lateral resisting elements are no more than 10% over stressed according to the 2022 CBC. Alternate: Lateral analysis is not required if total area of arrays is less than 250 sq ft over a second story roof or 350 sq ft over a first story roof.

Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
Yes
Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,PV Breaker,Load Side Taps,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
1
BOS Restrictions

Need an AC disconnect within 3' of the MSP

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Cover Page Notes

All Jobs [Contractor shall be present to assist city inspector on job site during inspection and fall protection shall be provided upon request by the city inspector, as needed. // City of Tustin will not be held responsible for roof damage that may result from accessing the roof for the inspection of the PV system. // The equipment and system and all associated wiring and interconnections shall be installed only by qualified persons.]

Roof Plan Notes

All Jobs [Conduit will be painted to match the exterior of the home // Solar panels shall be placed no more than 4-6 inches from the roof exterior. // All equipment requiring servicing shall meet the required clearances. // If UFER cannot be confirmed, then ground rods 6 feet apart and 8 feet minimum into the ground must be installed with continuous bond.]

Attachment Detail

INCLUDE DIMENSION SHOWING MAX HEIGHT OF TOP OF MODULE TO ROOF PLANE 6 MAX

Electrical Diagram

120% rule has to be stated on plans and load calcs must be included.

Electrical Diagram Notes

All Jobs [The GEC shall be continuous. // DC ground-fault protection shall be per 690.41 // The sum of the ampere ratings of the over current devices in circuits supplying power to a bus bar or conductor shall not exceed the rating of the bus bar or conductor.]

Label Page

Provide permanent signage at all AC disconnects: "PHOTOVOLTAIC ARRAY AC DISCONNECTS"

Custom Placards Required
1
Non Standard Revision Requirements

If the permit team has not submitted to the AHJ yet, do not include a revision letter with the plans. The AHJ finds it confusing.

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Tustin (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.