City of Temecula (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Date SolarAPP+ Accepted
- 45187
- Any SolarAPP+ Restrictions
- 1
- How Many Plansets Required
- 3
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Include any existing modules in the array roof coverage calcs to determine if modified setbacks can be used.
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Reducible Snow Load Allowed
- 0
- Max Attachment Spacing
- 96
- Structural Notes
Temecula does require Structural Calcs
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,PV Breaker,Line Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- ESS is not allowed in the garage or interior spaces. No exceptions.
- Demonstrate compliance that ESS is minimum 3' from other ESS and from doors/windows.
- Tesla Powerwall 2 will require a Rapid Shutdown Device. RSD (This should be indicated on SLD
If ESS is not in line of sight of MSP then ESS disconnect required within line of sight of ESS on same wall and not blocked by walls/gates/etc
1/31/24 ISOLATED LOADS PANEL WIRE SHOULD BE SIZED ACCORDING TO TESLA GATEWAY BREAKER SIZE. EXAMPLE: IF TESLA GATEWAY IS FED BY A 125A BREAKER, THEN THE WIRING FOR THE ISO PANEL SHOULD BE 1/0 EVEN IF WE HAVE A 100A BREAKER ACCORDING TO THIS AHJ
2/21/24 BACKUP LOADS PANEL WIRE SHOULD BE SIZED ACCORDING TO TESLA GATEWAY BREAKER SIZE. EXAMPLE: IF TESLA GATEWAY IS FED BY A 125A BREAKER, THEN THE WIRING FOR THE ISO PANEL SHOULD BE 1/0 EVEN IF WE HAVE A 100A BREAKER ACCORDING TO THIS AHJ
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
ALL JOBS
- Plans must show residential egress or state "NO RESIDENTIAL EGRESS"
- Call out 1st & 2nd story roofs
- Include spec sheets for all new equipment being installed including load centers and main/sub panels
- Provide certificate of compliance to confirm (ESS, Panels, Inverters, Racks, Etc.) is Listed for use by a NRTL (Nationally recognized testing laboratory
- Provide the Module Compatibility List to verify that the rack system has been evaluated and tested for grounding and bonding (UL2703) with the specified new solar module.
EXISTING SYSTEMS
- The site placard must show both the existing and new modules
- Show the type of Rapid Shutdown on the existing system (array boundary vs. module level shutdown) per CEC 690.12(B) and/or CFC 1205.4.2 and provide appropriate labeling and identification on Building Directory
EV CHARGER
- complete and submit the attached EV charger handout.
- Provide a floor plan that shows the location of the EV charger and remove all PV system details. The plan needs to be EV charger specific.
- Also, provide the product specs for the EV charger.
- Cover Page Notes
Provide a Building Code Data Legend on the Title Sheet. Include the following code information for each proposed building: a. Occupancy Classifications (e.g. R-3/U for Single Family Dwelling) b. Type of Construction (e.g. Type V-B for wood framed construction) c. Fire Sprinklers (Yes or No) d. Number of Stories
- Site Notes
Roof Mount [Emergency escape and rescue opening. Panels and modules installed on dwellings shall not be placed on the portion of a roof that is below an emergency escape and rescue opening. A 36-inch-wide pathway shall be provided to the emergency escape and rescue opening. CRC R324.6.2.2]
- Attachment Detail Notes
- Electrical Diagram
- Any existing conductors shown on the ELD must have their size called out.
- If Main breaker is to be used as the Rapid Shutdown Initiator, please indicate so on the ELD
- For SEEB Projects: Utilize 100A AC Disconnect for 63A CHINT breaker.
- Electrical Diagram Notes
Add the following notes: i. New circuit breakers shall match the manufacturer, type and kAIC rating of the (E) panel. ii. All outdoor equipment shall be raintight and hold a minimum NEMA-3R rating. [CEC 110.28, 404.4(A), 408.16] iii. If the existing main service panel does not have verifiable grounding electrode, it is the PV contractor's responsibility to install a supplemental grounding electrode.
- Label Page
Add the following notes: i. New circuit breakers shall match the manufacturer, type and kAIC rating of the (E) panel. ii. All outdoor equipment shall be raintight and hold a minimum NEMA-3R rating. [CEC 110.28, 404.4(A), 408.16] iii. If the existing main service panel does not have verifiable grounding electrode, it is the PV contractor's responsibility to install a supplemental grounding electrode.
Each ESS disconnecting means shall plainly indicate whether it is in the open (off) or closed (on) position and be permanently marked "ENERGY STORAGE SYSTEM DISCONNECT.”
The ESS disconnecting means shall be legibly marked in the field to indicate both the Nominal ESS AC voltage and Maximum ESS DC voltage [CEC 706.15(C)(1)]
“PHOTOVOLTAIC POWER SOURCE” or “SOLAR PV DC CIRCUIT” marking should be placed on all interior and exterior DC conduit, raceways, enclosures, and cable assemblies, every 10 feet, at turns and above/or below penetrations and all DC combiner and junction boxes. [CEC 690.31(D)(2)]
- Non Standard Planset Requirements
- N/A
- Non Standard Revision Requirements
- You will need to submit a full set plans, calcs and revision narrative.
Ground mount
- Ground Mount Fencing Required
- Situational
- Ground Mount Notes
10' ground mount setbacks case by case fencing on ground mounts