City of San Mateo (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching
How Many Plansets Required
3
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
None
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
1

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes
  • If battery system, include this note on ELD: Producer's storage device(s) will not cause the Host Load to exceed its normal peak demand.
  • Normal peak demand is defined as the highest amount of power required from the Distribution System by Producer's complete facilities without the influence or use of the energy storage device(s).
  • Provide anchorage details for the TESLA POWERWALL. Show the operating weight for the energy storage system
  • Provide locations of the windows/doors along the wall where ESS storage is to be located
  • Provide elevation view showing ESS is at least 3 ft away from any openings (windows or doors) into the dwelling per CRC 328.4.
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes

Plan set

Cover Page

Add a description of work to the cover sheet stating the system size, number of modules, and additional electrical equipment to be installed. Example: "14 (400w) roof mount solar modules PV rating at 5.6kw + (N) 100a subpanel"

Roof Plan

**BALLASTED SYSTEMS:** * signage or roof markings (e.g., yellow stripes) shall be provided delineating the area around the panel that must be kept free of obstructions. Please specify on the plans. * Electrical connections to ballasted arrays must be installed with flexibility to allow for seismic movement; provide a detail showing this connection. * Please check roof framing members for the additional dead load from ballast blocks and components per manufacturer’s specifications. Provide roof framing plan and check the most conservative loaded roof joists.

Electrical Diagram

Standard

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of San Mateo (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.