Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Rocklin (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredDigital Electrical,Digital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Date SolarAPP+ Accepted
45467
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching,MPU
How Many Plansets Required
2
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Electrical,Digital Structural
Structural Calculations Required
Yes
Ee Stamp Notes
  • CA-licensed electrical engineer
  • Complete stamping of all ESS-related electrical documents


Stamp Location On Plans
Top Right

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes


Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates,Load Relocation
Allowed POI
Load Side Taps,PV Breaker,Meter Adapter,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
75
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
1
ESS Notes

ESS REQUIRE EE AND PE STAMPS

  • Complete both the load calcs work sheet (the AHJ specific one uploaded below) and the ESS submittal checklist uploaded in the files below
  • Put "ESS Disconnect" on the A/C Disconnect on the ELD as well as the Placard
  • Provide an elevation showing the location of the battery and all other electrical equipment with full dimensions between all equipment and doors/windows
  • Note on elevation plan - โ€œA minimum of three feet clearance is required between ESS units and any door or window entering into the dwelling unit.โ€
  • Note on the elevation plan - โ€œA minimum of three feet clearance is required between ESS units/electrical equipment and vegetation.โ€
  • Include ESS Mounting Details
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements

Fill out City Of Rocklin checklist ahead of permitting

  • Load calcs: use AHJ template from the files below when load calcs are required
  • Each page of the plans needs to have either the designer's or Greg's signature on it. Fill out solar checklist for roof mount
Cover Page

Detailed Scope of Work(SOW) - LACO works fine.


  • (A) Number of story
  • (B) Occupancy Type
  • (C) Energy Storage System (ESS)
  • Total number of ESS Units
  • Number and Model
  • Location
  • -state under the scope of work where the battery will be mounted
Roof Plan

Array coverage calculations must include existing systems.

Attachment Detail

Indicate style, length and diameter of embedment bolts

Electrical Diagram

Centerfed 120%: Sometimes

Custom Placards Required
1
Non Standard Revision Requirements

Respond to each comment in writing, clearly describing what revisions were made and the location of your revisions (page, plan and detail number). All revisions shall be bubbled and indicated with a delta revision number

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Rocklin (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.