City of Reedley (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching,Derate
- How Many Plansets Required
- 2
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,PV Breaker,Meter Adapter,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Provide manufacturer’s specification sheets that document U.L. or other accepted listing agency listings for Photo Arry components associated with this installation.
- Cover Page
Please revise the plans to indicate the following on the cover sheet: 1. Building type of construction (usually VB). CBC Table 601 2. Occupancy group(s) of dwelling and garage (R3 & U). CBC 302.1 3. Please indicate (yes or no) if this structure is equipped or will be equipped with an automatic fire sprinkler system. 4. Building height above grade plane/number of stories
- Cover Page Notes
All Jobs [General contractor is to verify the dwelling unit’s smoke and carbon monoxide alarms per CRC Sections R314 and R315, prior to the final inspection.]
- Site
Please provide the wind and seismic design criteria on the drawings per CBC Chapter 16. Specify the wind speed, seismic design category and risk category.
- Site Notes
Photovoltaic modules shall not cover any vent pipe or exhaust.
The point of access area will not be over any doors, windows, or other obstructions.
- Electrical Diagram
Centerfed 120% allowed SPECIFY SURGE PROTECTION TO BE INSTALLED PER CEC 230.67 AND INDICATE TYPE. Please show/note the AIC rating for the new main breaker and solar breaker shall have an equal or greater AIC ratings than the existing breakers. CEC 690.13(E). or by other means of showing the PV system is rated for the available fault current.
- Electrical Diagram Notes
All Jobs [the PV breaker shall be located at the opposite end of the busbar from the main breaker. // New electrical shall be located at least three (3) feet from gas meter or gas shut-off valves.] MPU [The wire size and type of the service feeding conductor for the main service panel shall be determined by the utility provider. // Grounding electrode conductor shall be sized per CEC 250.66]
All Metallic raceways and equipment shall be bonded and electrically continuous.
- Label Page
Please show/note on the placard, “CAUTION: MULTIPLE SOURCES OF POWER.” Where multiple sources supply the building, the plaque or directory shall be marked with the wording, “CAUTION: MULTIPLE SOURCES OF POWER.” The marking shall comply with 110.21 (B) per 710.10 CEC
- Custom Placards Required
- 1
- Placards Notes
Permanent placards from placard sheet of plans
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim