City of Oxnard (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- How Many Plansets Required
- 3
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
36" Access pathway from eave to ridge required on all roof plains with solar panels
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 1
- ESS Notes
Provide information on how the ESS will be mounted, including type of screws that will be used. Label required: CAUTION: TRI POWER SOURCE SECOND SOURCE IS AC BATTERY THIRD SOURCE IS PHOTOVOLTAIC SYSTEM Provide elevation drawing demonstrating that ESS will be minimum 3ft from doors, windows, and other ESS.
ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes - with dimensions
Plan set
- Plan Set Requirements
* Racking/attachment system installation manual must be included with plans
- Cover Page
* Provide a scope of work for the project. AHJ does not have a set template for this, list a basic description of the work being done and materials to be installed. * Vicinity map MUST be black and white line drawing. Follow steps below to generate this: Follow this link: 1\. Style: Under "Style" click "choose a Snazzy maps style". Then type "lines" in the search bar that appears and select the first option. Then hit "apply style". 2\. Size & Location: Click the pencil icon. Under "Center Location", click the green text that states "Or search for a location". Enter the site address. Click "apply changes". 3\. Markers: click on "Add your first marker". Under "Location", click the green text that states "Or search for a location". Enter the site address and hit "apply changes". 4\. Zoom in to the map until only the site and the nearest cross streets are showing. Take a snip of this image to use as the vicinity map. DO NOT use the save image feature from the website. Doing so will cause the site to ask the user to register for an account.
- Site
* AHJ wants property lines _but not the dimensions_ please (This AHJ is very picky) * Please show all structures on site plan. If they appear unpermitted AHJ may request this to be labeled.
- Site Notes
All Jobs [ **MOUNTING HARDWARE IS TO CONNECT DIRECTLY TO ROOF FRAMING MEMBERS CONNECTIONS WHICH RELY SOLEY ON ROOF SHEATHING ARE NOT ACCEPTABLE]**
- Electrical Diagram
- Centerfed 120% allowed.
- Service upgrades: SPD required. Call out SPD on line diagram. Identify whether type 1 or type 2. Provide spec sheet for SPD.
- Electrical Diagram Notes
All Jobs [In dwelling units where branch-circuit wiring is modified, replaced, or extended in any of the areas specified in 210.12(A) or (B), the branch circuit must be protected by either a listed combination AFCI located at the origin of the branch circuit or a listed branch circuit AFCI located at the first receptacle outlet of the existing branch circuit unless the extension of conductors is 6ft or less and no outlets or devices are added]
- Custom Placards Required
- 1
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Setback Front Yard
- 25
- Setback Back Yard
- 25
- Setback Side Yard
- 15