City of Newport Beach (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Date SolarAPP+ Accepted
45205
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching
How Many Plansets Required
2
Revision Required
1
Rough Inspection
Racking Inspection
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

2018 FIRE SETBACKS

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
48
Structural Notes
  • Engineer must address in their calculations if ponding is a problem for roofs with less than 2:12 pitch to 1/4 inch per foot of slope.
  • Calculations must indicate the dead loads for all the roofing assembly components and the live loads used
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates,Load Relocation
Allowed POI
PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
75
De Rating Ampacity
1

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

ALL ESS JOBS

  • ALL ESS JOBS REQUIRE ELEVATION PAGE, FULLY DIMENSIONED, WITH CLEAR LABELING OF EACH PIECE OF EQUIPMENT RELATED TO THE SOLAR INSTALLATION
  • INDIVIDUAL ESS UNITS SHALL BE SEPARATED BY NO LESS THAN 3', ILLUSTRATE THIS ON THE ELEVATION PAGE
  • NO DIMENSION SHOULD BE SHOWN FROM GRADE TO BOTTOM OF BATTERY
  • ESS UNITS SHALL NOT BE LESS THAN 3' FROM DOORS AND WINDOW DIRECTLY ENTERING THE DWELLING UNIT, ILLUSTRATE THIS ON THE ELEVATION PAGE
  • ESS for shall be listed and labeled for use in accordance with UL 9540. -- INCLUDE SPEC SHEETS THAT CORRESPOND TO THIS REQUIREMENT
  • Inverters shall be listed and labeled per UL1741, provided as part of the UL9540 listing. -- INCLUDE SPEC SHEETS THAT CORRESPOND TO THIS REQUIREMENT

WHEN THE ESS IS TO BE LOCATED IN A GARAGE

  • Please provide dimensioned floor plan of garage. Interior clear dimensions of garage 20’ x 20’ minimum needed. Ensure equipment is protected by bollards, or outside of vehicle impact zone
  • MINIMUM 7' VERTICAL CLEARANCE REQUIRED FOR THE SIDE WALL OF THE GARAGE
  • MINIMUM 4' REQUIRED FOR SIDE WALL OF GARAGE
  • LISTED HEAT DETECTOR REQUIRED TO BE ILLUSTRATED ON PLANS, INCLUDE SPEC SHEET FOR HEAT DETECTOR
  • ESS in Garage - MUST be minimum of 3' off the ground due to flood potential

ESS disconnect required within 3' of MSP on same wall and not blocked by walls/gates/etc.

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements


Cover Page


Cover Page Notes

All jobs [OCCUPANCY GROUP: (R3/U)

CONSTRUCTION TYPE: (VB)

NUMBER OF STORIES:

SOLAR PANELS TO BE INSTALLED ON (FIRST STORY / SECOND STORY) <- DELETE WHAT DOES NOT APPLY, OR INDICATE THAT BOTH APPLY

EXISTING ROOF TYPE:

ROOF SLOPE/PITCH:

BUILDING IS/NOT (DELETE WHAT DOES NOT APPLY) EQUIPED WITH AUTOMATION FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH (NFPA 13D)] // [The maximum time to complete construction on a project is limited to three years from the date of the permit for all permits issued after August 21, 2019, as required by NBMC Section 15.02.095 // .


All work to comply with 2025 California Building Code; 2025 California Residential Code, 2025 California Electrical Code - Article 690, and manufacturer’s listing and installation instructions. // Inspection required for roof connection mounting assemblies prior to installing solar module where the racking system is not parallel to the roof slope. // Photovoltaic system’s fire classification must be Class A roofing material per Sections R902.3 or R904.4 and per amended Table 1501.1 NBMC // Testing, listing and identification complies with UL 1703 and UL 2703 as required per Section R902.4. // Photovoltaic system’s installation shall be per the manufacturer’s installation instructions]

Site
  • INDICATE LOCATION OF GAS METER
  • Remove call-outs to external EMT from the cover sheet and roof diagram.
  • If we are tying into an interior panel, indicate the location of the panel on the site plan
Site Notes

All Jobs [All new electrical equipment cannot be within 36” horizontal to the gas meter per Southern California Gas Company // EMT SHALL NOT BE OUTSIDE AND EXPOSED TO WEATHER PER NBMC 15.06.040]

Roof Plan


Roof Plan Notes

All Jobs [The photovoltaic system's fire classification must be Class A roofing material per sections R902.3 or R904.4 and per amended Table 1501.1 NBMC]

  • (We need to include spec sheets that correspond to the above requirement)
Attachment Detail


Electrical Diagram

AHJ does not allow EMT that is exterior. Change callout to RMC

Electrical Diagram Notes

All Jobs [ALL ELECTRICAL EQUIPMENT HAS A MINIMUM 3' WORKING CLEARANCE IN FRONT OF IT // EMT SHALL NOT BE OUTSIDE AND EXPOSED TO WEATHER PER NBMC 15.06.040]


MPU:

  • PROVIDE MANUFACTURER DATA SHEET FOR NEW MAIN SERVICE PANEL
  • SURGE PROTECTIVE DEVICE MUST BE SHOWN ON ELD, INCLUDE DATA SHEET FOR THIS AS WELL
Custom Placards Required
1
Placards Notes

ALL SPECIAL PLACARDS LISTED ON PLACARD SHEET OF PLANS NEED TO BE ONSITE

Non Standard Revision Requirements
  • Cloud all changes pertaining to current revision -- remove old clouding from previous revisions.
  • The resubmission letter should list all changes made, numbered, and shall match the delta placed on the plans.
  • DO NOT use abbreviations in narrative letter such as BOS, etc

Ground mount

Ground Mount Fencing Required
Mesh/Scrim