City of Murrieta (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching,Trenching,MPU,MPU
How Many Plansets Required
1
Revision Required
1
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes - 10kW+
Wet Stamps Required
None
Structural Calculations Required
Yes
Ee Stamp Notes

If over 10kw requires or if there's swimming pool / spa on 120% rule then EE stamp on SLD

Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category C

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Battery calcs required for battery projects

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates,Load Relocation
Allowed POI
Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

ESS disconnect required within 6ft of BATTERY on same wall and not blocked by walls/gates/etc


Provide ESS Mounting details.


Garage mounted ESS require Elevation view


All battery jobs -

Provide exterior elevation drawings of the system equipment and identify all required clearances. CRC 106


Bldg: ESS units shall be separated from each other by not less than 3 feet except where smaller separation distances are documented to be adequate based on large-scale fire testing complying with Section 1207.1.5 of the California Fire Code. CRC 328.3.1 -Identify 3' separation or incorporate approved documentation for into plan set for closer spacing. On the elevation plan, identify spacing between ESS units in compliance with 9040A and the manufacturer installation instructions.

Bldg:


ESS (Batteries) that are wall mounted and weigh 200 lbs. (or more), must provide: -Structural details in the drawings. AND -Structural calculations as a separate document. (CRC 301.1) *Structural documents shall be stamped and signed by a California licensed professional engineer.

Separate ESS Disconnect Required
Local Disconnect
ESS Elevation Detail Required
Yes

Plan set

Electrical Diagram

When relocating loads, clarify which loads are being relocated to the sub panel. Centerfed 120% allowed

MPU

Include existing panel rating on ELD, this can be a simple note "Existing MSP is 125A/100A"

Label Page

PLACARD: ROTATE PLACARD SO THE MSP IS ALIGNED WITH THE BOTTOM Directional placard shall be oriented relative to where an individual will be standing looking at the placard. Meter panel to be at the bottom of placard when oriented correctly.


Placard required for the main breaker derate: MAIN PANEL DERATED TO xxxA. DO NOT UPSIZE

Custom Placards Required
1
Non Standard Revision Requirements

When revising system information on the plans, replace the old information rather than adding the new information next to it. Having both old and new information confuses the AHJ.

Ground mount

Ground Mount Fencing Required
Situational
Ground Mount Notes

AHJs require 10โ€™ minimum distance around the array for maintaining a clear fire zone. Separate fencing is not required for the ground mount residential PV array, so long as the property is fully fenced. Ground Screws allowed with engineering. Freeze/thaw depth is 12โ€-24โ€. No grade requirements. If in a flood hazard zone then a geotechnical report and addition calcs by the Engineer shall be required. This may result in a minimum height above grade to keep the array out of the flood water height.