City of Mountain View (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- How Many Plansets Required
- 2
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category B
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
ALL JOBS: * Provide one electronic set of plans with a digital/electronic stamp and signature of the designer/architect/engineer responsible for preparing the plans. * Provide one electronic set of supplemental documents in separate PDF files. * All onsite plan sheets must be compiled into one PDF file. * All offsite plan sheets must be compiled into one PDF file. * Label all PDF files; i.e. Onsite Plans, Offsite Plans, Response Letter, etc. BALLASTED SYSTEMS: * Justify friction calculations for the ballast system on the existing roofing material for the ballast system. * Provide demand and capacity/DCR (demand capacity ratio) calculations for the ballast system
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 1
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
ELEVATION PAGE:
- show any openings to the building in relation to the ESS.
- Make ESS location clear - notate whether it is located on the interior or the exterior of the building and where it is mounted on the building.
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- Yes
Plan set
- Plan Set Requirements
- All Plans to be formatted as 11"x17"
- Roof Plan
**BALLASTED SYSTEMS:** * Provide adequate guards per CBC 1015.6 when solar arrays are installed less than 10 feet from the edge of the roof. * Revise the plans to specify that roof markings (e.g. yellow stripes) will be provided delineating the area around the panel that must be kept free of obstructions. Identify the area and the marking method on the roof plan.
- Electrical Diagram
Standard
- Custom Placards Required
- 1
- Non Standard Revision Requirements
Response to comments letter shall be a separate PDF file.
Ground mount
- Ground Mount Fencing Required
- No