City of Mountain View (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching
How Many Plansets Required
2
Revision Required
0
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
None
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

ALL JOBS: * Provide one electronic set of plans with a digital/electronic stamp and signature of the designer/architect/engineer responsible for preparing the plans. * Provide one electronic set of supplemental documents in separate PDF files. * All onsite plan sheets must be compiled into one PDF file. * All offsite plan sheets must be compiled into one PDF file. * Label all PDF files; i.e. Onsite Plans, Offsite Plans, Response Letter, etc. BALLASTED SYSTEMS: * Justify friction calculations for the ballast system on the existing roofing material for the ballast system. * Provide demand and capacity/DCR (demand capacity ratio) calculations for the ballast system

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
1

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

ELEVATION PAGE:

  • show any openings to the building in relation to the ESS.
  • Make ESS location clear - notate whether it is located on the interior or the exterior of the building and where it is mounted on the building.
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes

Plan set

Plan Set Requirements
  • All Plans to be formatted as 11"x17"
Roof Plan

**BALLASTED SYSTEMS:** * Provide adequate guards per CBC 1015.6 when solar arrays are installed less than 10 feet from the edge of the roof. * Revise the plans to specify that roof markings (e.g. yellow stripes) will be provided delineating the area around the panel that must be kept free of obstructions. Identify the area and the marking method on the roof plan.

Electrical Diagram

Standard

Custom Placards Required
1
Non Standard Revision Requirements

Response to comments letter shall be a separate PDF file.

Ground mount

Ground Mount Fencing Required
No
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Mountain View (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.