City of Montebello (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
3
Revision Required
0
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
None
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,Load Side Taps,PV Breaker,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements

Make sure include the APN# of the lot


CONDUIT MUST BE RAN THROUGH THE ATTIC

Add the following notes below:


Do not cover mechanical and plumbing vents on the roof with solar PV panels. Pathways (R324.6.1)


Provide an unobstructed (including but not limited to, conduit, pull boxes, vents, etc.) fire department clear access pathway of at least 36 inches in width from the eave to the ridge on each slope where panels and modules are located, and/or 18 inches in width adjacent to hips and valleys. Setback at Ridge (324.6.2) 3\.


Provide an unobstructed (including but not limited to, conduit, pull boxes, vents, etc.) fire department clear smoke ventilation space of at least 36 inches in width along the rige, or 48 inches when the space is obstructed with vents.

Roof Plan Notes

EMT Conduit shall run either under the roof eave or through the attic. All exposed wiring shall be neatly bolted and painted to match the existing structure

Electrical Diagram

Add the AIC rating of the main breaker, relevant subpanel breaker that will be installed, and of the PV breaker. Identify existing UFER Ground wire size. Minimum #4 or #6 rod.

Label Page

2017 LABELS

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
No
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Montebello (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.