City of Menifee (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Date SolarAPP+ Accepted
44368
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching,MPU
How Many Plansets Required
1
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes - MPU
Wet Stamps Required
None
Structural Calculations Required
Yes - Existing PV
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category C

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes
Standard
Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
Yes
Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Meter Adapter
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91
BOS Restrictions

Standard

Battery / ESS

Unique Battery Placards Needed
1
ESS Notes

Per corrections on staff 431034, SEEB & Enphase batteries do NOT require ESS disconnects.


WHEN DOING A BATTERY BACKUP SYSTEM. PLEASE ATTACH DOCUMENT BELOW.

Please comply with California Fire code 1206.2

Detail on plans:

  • #1 Location and layout of the room where the batteries are installed.
  • #2 Details on the fire-resistance-rated assemblies.
  • #3 quantities and types of batteries
  • #4 manufactures specifications and ratings
  • #5 Details on energy management system.
  • #6 location and content of signage.
  • #7 Details of fire extinguishing and smoke detection system.
  • #8 Rack storage arrangement and seismic support.

Please clarify how emergency services would shut down all PV including the battery back up. This must be done within 3 feet of the service entrance.

Please add a really accessible emergency service disconnect within 3 feet of the main service panel. It must shut down all solar and battery systems per code section 110.25, 705.22,705.23, 705.31, 706.7, 706.30

ESS disconnect required when the ESS is

more than 10 feet, separated by a gate or not

within line of sight of the service disconnect

When ESS are installed inside a garage, there must be an approved heat detector interconnected with the existing alarm system.

The elevation diagram must show elevation of all equipment along with measurements between equipment, gates, windows and doors.

ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc


Accepts 9540A spacing.

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements

Please indicate roof coverage percentage for ALL SOLAR and do not include any patio covers (if any)

Cover Page

Minimum size 14 font required on text throughout plan set



MPU requires panel upgrade permit first.

Site

Indicate all existing structures on property

Indicate existing wall, fence or gate

AC disconnects required if inverter is not within line of sight of MSP

Site Notes

Battery [ESS will not be within 3' of a door or window]

Roof Plan

On a separate page, show rafter/truss layout, array supports (rails), roof penetrations, and connections to the roof-framing members (attachments).

Show the conduit run and indicate how far the conduit is mounted off the roof deck

Attachment Detail

please show the truss layout and specific attachment detail


Please show ESS Mounting Details

Electrical Diagram

All Projects:

  • Required to show all breakers in Sub Panel.
  • Required to show the wire size between the Main Panel and Sub Panel.
  • The Breaker for Sub Panel in the Main Panel can not exceed the Sub Panel Main Breaker rating.
  • Text on the line diagram cannot be smaller than size 12.
  • Centerfed 120% allowed

Add-on System:

  • If the disconnect only shut down a portion of the system it will need to be labeled accordingly.
  • Please identify all disconnects and what they shut down.

EV Chargers:

  • Add EV Charger to Load Calc's
  • Add EV Charger in Directory Placard
  • Indicate EV Charger integrated to the inverter in the line diagram
  • Indicate EV charger station on the scope of work. Could be combined with the inverter see note for EV Charger to clarify to AHJ

DERATES:

  • Include the torque wrench serial number, calibration date, and certification number on the ELD
  • Include a datasheet for the derated main-breaker we are installing (Google the existing MB part #, with the new amperage + datasheet)

Serial number 204230301

Calibration date - 4/12/2023

Certificate number - 51-01895


MPU:

  • need to provide the existing MSP bus and breaker rating on ELD
Electrical Diagram Notes

All Jobs [IF UFER IS NOT ACCESSIBLE OR VERIFIABLE INSTALL (2) NEW 5/8"ร˜ X 8' LONG, 6 FEET APART GROUNDING RODS AND BOND SOLAR SYSTEM EQUIPMENT GROUNDING ACCORDINGLY. PER NEC 250]

Label Page

Use NEC 2020 in the label dropdown

Do not use Menifee Placard

Site placard: The orientation of the house must match the layout when looking at the placard

Custom Placards Required
1
Placards Notes
  • If more than 1 ESS installed - Batteries must have naming placard: "Battery 1" "Battery 2" etc
  • Permanent hard Main Site Placard + BOS hard placards required
Non Standard Revision Requirements

You must provide a correction letter stating all the corrections and how they were corrected along with clouding the plans and adding "deltas" with revision dates next to each clouded section.

Ground mount

Ground Mount Fencing Required
Yes
Ground Mount Notes

If the inverter is on the array, we need to have an AC disco next to the inverter.

Add note, Conduit depth must be 24 inches to the top of the pipe under drivable areas

Provide details for fencing, if applicable


Distance from house to GM array required


for septic records: Request for Public Records | Riverside County Department of Environmental Health

Setback Front Yard
25
Setback Back Yard
25
Setback Side Yard
20
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Menifee (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.