City of Manhattan Beach (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Date SolarAPP+ Accepted
45573
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching,MPU,Derate
How Many Plansets Required
2
Revision Required
1
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
None
Structural Calculations Required
No
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Panels and modules shall be located in a manner that provides a minimum 3 feet wide (968 mm) clear perimeter around the edges of the roof. The access pathway shall be capable of supporting the firefighters accessing the roof, i.e. over an exterior load-bearing wall. This requirement holds true for all roof types including hip, gable, and flat roofs. Access pathway clear width shall be over the load bearing wall inward. Not over the eaves. Panels/modules shall be located no closer than 6 inches minimum (12 inches preferred) to a hip or valley if placed on both sides of the hip or valley. Where panels/modules are located on only one side of a hip or valley that is of equal length, the panels may be placed directly adjacent to the hip or valley. Panels/modules shall be located on only one side of any ridge and shall be located no higher than 1 foot below the ridge. EXCEPTIONS: 1. Where solar panels are located a minimum of 5 feet from the ridge on the opposing side. 2. Where alternative means of allowance for smoke ventilation operations have been approved by the Fire Chief or Fire Marshal.

Structural & loads

Wind Speed
110
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes
Structural Calcs are required if the home was built prior to 1990
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes
  • LG CHEM battery require a DC disconnect next to the inverter. AC disconnect between the BUG and Feeder Source Electrical disconnect for the unit shall be provided within sight of the unit and readily accessible (not behind the unit) Impact protection is required if the ESS is being installed interior to the building/garage. Batteries may be stacked if allowed by the manufacturer
  • ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc
  • If ESS install is inside, show the distance in ft from the mounted wall to the opposite wall on the building elevation page. Minimum 18' required per MBMC 10.64.090 (Reference project ID 538050)
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements
  • Rigid Conduit (edited 4/20) RWA Structural Calcs are required if the home was built prior to 1990 3ft set back from load bearing walls Rigid Conduit (edited 4/20)
  • RWA LG CHEM require a DC disconnect next to the inverter. SEE PLAN CHECK GUIDELINES DOCUMENT FOR FIRE SETBACKS ON PITCHED ROOFS AHJ HAS VERY STRICT REQUIREMENTS
  • Setbacks for flat roofs: 1204.2.1.2.1 Flat and Alternative Roofs. Panels and modules shall be located in a manner that provides a minimum 3-foot-wide (968mm) clear perimeter around the edges of the roof.
  • The panels and modules shall be installed in a manner that creates smoke ventilation areas over common hallways and corridors or in an area approved by the Fire Code Official.
Cover Page

Answer with project specific details:

CONSTRUCTION TYPE: V-B

OCCUPANCY: R-3/U

NO. OF STORIES: 1

AREA SF OF EACH FLOOR: 1368.00 SQFT

GARAGE SF: 420.00 SQFT

TOTAL AREA SF: 1719.79 SQFT ROOF

AREA SF: 1786.00 SQFT

FIRE SPRINKLER SYSTEM: NO

SMOKE ALARM SYSTEM: NO

CARBON MONOXIDE DETECTOR: NO

HEAT DETECTOR: NO

Site

ALL JOBS

  • Label AC Disco as: Visible Blade, Lockable
  • Label the exterior walls of the structure.
  • When equipment is installed inside a garage, provide a garage floor plan demonstrating that there will be an 18' wide x 19' long parking area in the garage that the installed equipment will not infringe on.
Site Notes

All Jobs [Contractor to ensure that the existing house has smoke alarms and carbon monoxide detectors that are installed throughout the existing house per CRC // Interior remote disconnect: DC array thar are routed through the building are required to be in galvanized rigid steel conduit from any PV array rooftop J-Box fusible combiner box through any attic. // Conduit run through the interior of the building shall be installed a minimum o f 18" below the roof surface. // Conductors contained in metal raceways and Type MC metal-clad cable that complies with 250.118(10) conduit not approved for exterior use or the interior attic space 18" below the roof surface and lower. // Exterior remote disconnect and @ inverter/panel: DC and Ac array conductors that are routed and installed completely on the exterior of the building shall be contained in galvanized rigid steel conduit from any PV array rooftop "J" box fusible combiner box. These DC/AC array conductors install in galvanized rigid steel conduit need to be run entirely on the exterior of the building.]

Battery [PENETRATION OF WALLS AND BUILDING SHELL SHALL BE RODENT PROOF PER CODE. // EQUIPMENT SHALL BE LISTED AND SHALL BE INSTALLED PER MFR INSTRUCTIONS. // WALL AND ROOFS MOISTURE BARRIER SHALL REMAIN INTACT.]

Roof Plan
  • DC and AC array conductors that are on the exterior of the building shall be contained in a galvanized rigid steel conduit from PV array J-Box to equipment. (this needs to be clear on plans)
  • Indicate the direction of the roof's pitch
Attachment Detail
  • Show the dimension from the top of the roof to the top of the solar panel. Max 12"
Electrical Diagram
  • Disconnects shall be blade type & listed.
  • Specify on plans EMT not approved, use RIGID conduit
Electrical Diagram Notes

All Jobs [ELECTRICAL DISCONNECT FOR THE UNIT SHALL BE PROVIDED WITHIN SIGHT OF THE UNIT AND READILY ACCESSIBLE (NOT MOUNTED BEHIND THE UNIT) MAX 3FT DISTANCE PER CODE]

Label Page
  • Must call out CEC and CFC codes only, no NEC or IFC.
Non Standard Planset Requirements
BOS Elevation

Ground mount

Ground Mount Fencing Required
No