City of Madera (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Adopted
- Date SolarAPP+ Accepted
- 45180
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Existing Systems,Trenching
- How Many Plansets Required
- 2
- Revision Required
- 1
- Rough Inspection
- Footing inspection
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- No
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
- Show and label "Fire Access Points" with a leader. Not the same as pathways, but where a firefighter would place a ladder
- 18 inches required on each side of each hip or valley, or a minimum of 3 feet on one side.
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Snow Load Notes
N/A
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
No published information about battery placement. If battery system, include this note on ELD: Producer's storage device(s) will not cause the Host Load to exceed its normal peak demand. Normal peak demand is defined as the highest amount of power required from the Distribution System by Producer's complete facilities without the influence or use of the energy storage device(s).
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Roof Plan
- Show and label Fire Access Points with a leader. Not the same as pathways, but where a firefighter would place a ladder.
- Show placement of attachment points on the roof plan. Show spacing between attachments. Identify lengths of all cantilevers
- Roof Plan Notes
All Jobs [FIRE ACCESS POINTS WILL NOT BE LOCATED OVER DOORS OR WINDOWS OR WILL OTHERWISE BE OBSTRUCTED.]
- Electrical Diagram
Include spec sheet for solar ready MPU's SLD line diagram needs to match exactly how MSP is if e.g, top-fed it needs to be shown, Include a photo(s) of the main panel, must be able to read main breaker and busbar rating. Must provide information when tapping including spec sheets for any products used during tap. Must use special listed lugs for connections or otherwise void listing on the panel.
- Custom Placards Required
- 1
- Placards Notes
Permanent/Engraved Placards Required
- AHJ is very particular that site placard be very detailed - Correct orientation - Any gates & fences present - Does not accept generic site placards
- Correct address must be present on main site placard as well
- Non Standard Planset Requirements
- Single Line Diagram
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim