City of Lynwood (CA)

California Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusAdopted
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2025 CALIFORNIA BUILDING CODE

2025 CALIFORNIA ELECTRICAL CODE

2025 CALIFORNIA FIRE CODE

2025 CALIFORNIA PLUMBING CODE

2025 CALIFORNIA MECHANICAL CODE

2025 CALIFORNIA ENERGY CODE

2025 CALIFORNIA RESIDENTIAL CODE

2025 CALIFORNIA ADMINISTRATIVE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Adopted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
Existing Systems,Trenching
How Many Plansets Required
3
Revision Required
0
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
None
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Fire access pathways shall be 3 ft in addition to the length of the overhang. (If overhang is 1 ft, total setback would be 4 ft) Pathways must be over supported roof structure meaning setbacks start at a load bearing wall

Structural & loads

Wind Speed
130
Wind Notes

Exposure Category B

Snow Load
0
Snow Load Notes

N/A

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

WS: 130mph. Exposure B.

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
1
BOS Restrictions

Standard

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

This AHJ requires County of LA ESS requirements

  • Please follow this link to County of Los Angeles (ESS Requirements) (CA)
  • add rapid shutdown device to disconnect schedule

ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Site


Site Notes
  •  Do not cover mechanical and plumbing vents on the roof with solar PV panels. 
  • No active fire sprinkler.  
  • A roof access point should be provided that does not place a ground ladder over an opening such as a window or door. Located at a solid point in the building construction and in the locations where the access point does not conflict with overhead obstructions such as tree limbs, wires, or signs.  
  • Notify serving utility before activation of PV system.  
Roof Plan
  •  Do not cover mechanical and plumbing vents on the roof with solar PV panels. 
  • No active fire sprinkler.  
  • A roof access point should be provided that does not place a ground ladder over an opening such as a window or door. Located at a solid point in the building construction and in the locations where the access point does not conflict with overhead obstructions such as tree limbs, wires, or signs.  
  • Notify serving utility before activation of PV system.  
Attachment Detail

Structural plans and calculations shall be signed by a licensed civil engineer showing supporting member sizes, dimensions, materials and loads imposed on the roof structure are adequate, unless all of the following conditions are met:


The existing roofing is either of wood shingle, asphalt shingle, or rolled/torch-down with two layers maximum.

 

The solar PV system weighs not more than 4 psf.


The maximum allowable concentrated load imposed by a solar PV system support onto the roof structure is 40 lbs.


The solar PV panels are installed with no portion thereof more than 18 inches above the roof immediately below. 


Maximum spacing for supports of the solar PV system on wood-framed construction shall be 48 in. on center and shall be anchored to roof rafters or to solid blocking with a minimum of one 5/16 in. diameter lag screw embedded a minimum of 2 1/2 in. or as recommended by the manufacturer, whichever is more stringent.  

Electrical Diagram

120% rule allowed per CEC 705.12(B)(2)(3)(d)

Custom Placards Required
1
Placards Notes

Standard CA permanent placard requirement

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Lynwood (CA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.