City of Lake Elsinore (CA)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 CALIFORNIA BUILDING CODE
2025 CALIFORNIA ELECTRICAL CODE
2025 CALIFORNIA FIRE CODE
2025 CALIFORNIA PLUMBING CODE
2025 CALIFORNIA MECHANICAL CODE
2025 CALIFORNIA ENERGY CODE
2025 CALIFORNIA RESIDENTIAL CODE
2025 CALIFORNIA ADMINISTRATIVE CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 1
Stamps
- Ee Stamp Required On SLD
- Yes - 10kW+
- Wet Stamps Required
- None
- Structural Calculations Required
- Yes
- Ee Stamp Notes
If Project is over 10kW, SLD needs to be stamped by EE SCE requires EE stamp on SLD for Line Side Tap POI
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 110
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,Meter Adapter,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
- BOS Restrictions
AC Disco to be on same side of fence as MSP
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Battery jobs require special placards. Spacing. Individual units (batteries) shall be separated from each other by at least 3 feet. (1206.11.2.1) Fire detection. Rooms, basements, and attached garages in which ESS are installed shall be protected by smoke alarms in accordance with R314. A listed heat detector shall be installed in locations within dwelling units and attached garages where smoke alarms cannot be installed based on their listing.(1206.11.6) Protection from impact. ESS installed in a location subject to vehicle damage shall be protected by approved barriers. (Bollards) (1206.11.7) Ventilation. Indoor installations of ESS that include batteries that produce hydrogen or other flammable gases during charging shall be provided with mechanical ventilation in accordance with Section 1206.6.1 and the California Mechanical Code (1206.11.8)
ESS disconnect required within 6ft of ESS on same wall and not blocked by walls/gates/etc
- Separate ESS Disconnect Required
- Local Disconnect,ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Correction response required for any plan revision Site address must match the site address on the utility bill. Confirm that the city matches and update the plans to match the utility bill if there is a discrepancy. Existing Systems List the manufacturer name and model number of the existing equipment
- Site
Disconnect to be next to Main Panel
- Electrical Diagram
120% rule allowed per CEC 705.12(B)(2)(3)(d) If Project is over 10kW, SLD needs to be stamped by EE
- Label Page Notes
All Jobs [All placards to be reflective]
Ground mount
- Ground Mount Fencing Required
- No